voda
0
Russia to Set Up Nuclear Power Plants in Rwanda

On the eve of the Russia-Africa summit in Sochi last week, Rwandan officials approved a deal with Russia to advance the use of nuclear energy. The deal was first signed last December in Moscow, which was the roadmap for the Inter-Governmental Agreement on the use of nuclear energy. Finally, the Russian state-owned Rosatom Global nuclear company reached an agreement in May to set up the nuclear plant by 2024.

Based on the agreement, a Centre for Nuclear Science and Technology and a nuclear power plant in Rwanda will be built in Kigali by Russian scientists. This will facilitate experiments and scientific research.

Source : Strategic Research Institute
voda
0
SNC-Lavalin’s Atkins to Decommission German Lingen Nuclear Power Plant

SNC-Lavalin’s wholly owned subsidiary Atkins Energy Germany GmbH has won a contract from RWE Nuclear GmbH to progress the decommissioning of its Lingen boiling water reactor through segmenting and packaging the reactor and internals. The four-year contract includes segmentation and packaging of the reactor vessel and its internals to enable disposal and subsequent site clearance. The 268MW Lingen nuclear power plant, located in Lower Saxony, has been shut down since the late 1970s and was partially decommissioned. Completing the decommissioning is part of Germany’s decision to phase out nuclear power.

In addition to the Lingen decommissioning work, SNC-Lavalin is executing multiple decontamination and decommissioning projects in the United States as part of Comprehensive Decommissioning International, LLC, its joint venture company with Holtec.

Source : Strategic Research Institute
Bijlage:
voda
0
Rosatom looks for collaboration with India for developing small & medium sized reactors

Russian nuclear energy giant Rosatom has expressed interest in collaborating with Indian companies not only for the construction of large nuclear power plants, but also to jointly work on small and medium sized reactors. Nikita Mazein, VP Rusatom Overseas, said “Rosatom is developing small and medium-sized solutions based on light water reactor unit of Russian design. In Russia, we have commissioned and will so be operationalizing the first Floating Nuclear Power Plant this year. There is need to explore the possibility of such projects in the coastal areas of South Asia. The segment can provide opportunity for furthering the nuclear cooperation between India and Russia. For those countries that don’t have significant demand or the system capacity to absorb large capacity power units, a similar solution with 50-100 MW units can be useful. We are also in talks with some international partners for development of such units in third countries. We want to enhance our cooperation beyond execution of present projects.”

Making a case for nuclear energy, the Rosatom representative said that besides coal, only nuclear can provide the base load energy required to curb Carbon Dioxide emissions.

Rosatom is the main equipment supplier and technical consultant in the construction of the Kudankulam Nuclear Power Plant. Russia and India have an action plan document for the construction of second nuclear power plant. The two countries are planning to develop a project of up to six nuclear power units of Russian design at a new site in India.

Source : Strategic Research Institute
voda
0
Rosatom Launch Construction of New Reactor at Bushehr Nuclear Power Plant in Iran

Works on the second stage of Iran’s Bushehr nuclear power plant officially kicked off in the country as concrete was poured for a new reactor base on Sunday. The new reactor is one of two officially under construction since 2017 and is located about 750 kilometers south of Tehran. Russia’s state atomic energy corporation Rosatom is carrying out the construction project for the second stage of the NPP, building the second and third power units. Last year, Rosatom began preparations for pouring concrete at the site.

The Bushehr plant is the first nuclear power facility in the Middle East. Tehran estimates that each 1,000 MW reactor will save Iran 11 million barrels of crude annually. It is eyeing several ways to spend the additional megawatts, including powering a water desalination plant in Bushehr province.

Source : Strategic Research Institute
voda
0
Afrika omarmt kernenergie

Al decennia moet Afrika het doen met één kerncentrale. Dat is die van Koeberg in Zuid-Afrika. Deze verzorgt 5% van de stroomvoorziening van het land.

Plots is er nu uitzicht op een enorme uitrol van kerncentrales in een groot deel van Afrika. Die centrales worden gebouwd door het Russische Rosatom, een van de grootste spelers in kernenergie wereldwijd.

In de laatste week van oktober ontmoette de Russische president Poetin vrijwel alle Afrikaanse leiders in Sotchi. Maar liefst twintig memorandums of understanding rond de levering van kernenergie werden getekend. En het blijft niet bij intentieverklaringen. Komend jaar start Rosatom al met de bouw van een forse kerncentrale in het Egyptische El Dabaa. Waarschijnlijk zullen Ethiopië en Nigeria snel volgen.

Dat is goed nieuws op een continent met 1,2 miljard mensen waarvan nog maar de helft beschikt over elektriciteit. En waar deze eeuw nog eens twee miljard mensen bijkomen. De langzaam groeiende productie van elektriciteit houdt de groeiende vraag simpelweg niet bij. Wie in Afrika wél is aangesloten op het stroomnet, betaalt dubbel zoveel voor zijn elektriciteit dan iemand in Europa, terwijl onderbrekingen aan de orde van de dag zijn.

Afrikanen zijn wel klaar

met duurzame voorstellen uit het westen

En zo blijven de allerarmsten veroordeeld tot hernieuwbare energie: tot hout, stro en mest. Veel, goedkope en betrouwbare elektriciteit, zo vinden steeds meer Afrikanen, is dan ook topprioriteit. En Russische kerncentrales kunnen die leveren.

Westerse milieu- en ontwikkelingsorganisaties, tot de Wereldbank toe, hebben een andere oplossing. Afrika moet volledig aan de elektriciteit uit biomassa, water en zon. En die kan lokaal worden opgewekt met eigen zonnepanelen en centrales op biomassa- of waterkracht.

Daarmee kan elk Afrikaans huishouden, op het platteland en bestaande uit vijf personen, aan 250 kilowattuur elektriciteit worden geholpen. Op jaarbasis wel te verstaan. Dat is net genoeg om vijf uur per dag een lampje te laten branden, een telefoon op te laden en naar de radio te luisteren. Een gemiddeld huishouden van vijf personen in Nederland verbruikt 4400 kWh.

Geen wonder dat de Afrikanen wel klaar zijn met duurzame voorstellen uit het Westen. Het Russische aanbod is heel wat aantrekkelijker.

fd.nl/futures/1324019/afrika-omarmt-k...
voda
0
Open Vessel Testing Now Underway for Vogtle Unit 3

Major systems testing is underway at Georgia Power's Vogtle 3 & 4 nuclear expansion project near Waynesboro, Georgia, as the site continues to transition from construction toward system operations. The latest phase of testing, Open Vessel Testing, will demonstrate how water flows from the key safety systems into the reactor vessel ensuring the paths are not blocked or constricted. Open Vessel Testing will also confirm that the pumps, motors, valves, pipes and other components of the systems function as designed. It follows the Integrated Flush process, which began in August, to push water through system piping and mechanical components that feed into the Unit 3 reactor vessel and reactor coolant loops for the first time. Integrated Flush will clean and remove any foreign material ahead of the initial startup of the unit.

Significant progress continues at the site with recent milestones completed, including the placement of the final reinforced concrete portion of the Unit 4 shield building. The 148-cubic yard placement took eight hours to complete and, once cured, allows for the placement of the first course of double-decker panels. Also, the upper inner casing for the Unit 3 high-pressure turbine has been placed, signifying the completion of the centerline alignment, which will mean minimal vibration and less stress on the rotors during operations, resulting in more efficient power generation.

Vogtle 3 & 4 is currently the largest jobs-producing construction project in the state of Georgia, with more than 8,000 workers currently on site, and more than 800 jobs available once the units begin operating.

Source : Strategic Research Institute
voda
0
Rosatom Experts Participate in Future of Light Water Reactor Technology in India Conference

The international conference was organized by the Bhabha Atomic Research Centre and Nuclear Power Corporation of India Limited under the aegis of Homi Bhabha National Institute from 11 to 13 November, 2019 in Mumbai. The event was devoted to questions of future utilization of light water reactors in India to supplement existing plans of construction of heavy water pressurized reactors. During the conference participants discussed issues and possibilities of localization of light water reactor systems manufacturing .

Rosatom State Corporation experts in their presentations addressed topics on further development of cooperation between Russia and India in the sphere of light water reactors and specific features of their licensing and safety requirements, as well as presented key VVER-1200 safety systems. Also, perspectives of small modular reactors development were discussed.

The event was attended by the heads and management of Department of Atomic Energy, Atomic Energy Regulatory Board, Bhabha Atomic Research Centre, Homi Bhabha National Institute and other organizations from India and other countries, that are involved in design, building and operations of light water reactors.

Source : Strategic Research Institute
voda
0
Rosatom Installs Core Melt Localization Device at Unit 3 of Kudankulam Nuclear Plant

The case of the core melt localization device or the so called molten core catcher was installed in the design position under the reactor pit of Unit 3 of the Kudankulam Nuclear Power Plant in Tamil Nadu in India. Core catcher for Kudankulam NPP is a device of new generation adapted for the relevant site conditions and safety requirements, it has improved seismic resistance, hydro-dynamic and shock strength, as well as equipped with flood protection and simplified installation and assembly technology. According to the project, a core melt localization device or a core catcher, is installed at the bottom of the station’s protective shell. It is designed to localize and cool the molten core material in case of a hypothetical accident that could lead to damage to the core. The core catcher allows the integrity of the protective shell to be preserved and thus excludes radioactive emission in the environment, even if the hypothetical accident is serious. The case of the device weighs 147.5 tons. The equipment was lifted to the height of 27 meters above the surface and installed in the design position by means of the tracked crane Liebherr LR11350 which is placed between two nuclear islands.

Except for the case, main components of the core catcher are block-assemblies filled with special non-metallic materials, maintenance platform, cantilever truss and bottom plate.

The main feature of the Kudankulam NPP project is its unique combination of active and passive safety systems that provides maximum resistance against external and internal influences. The passive safety systems are capable of functioning even in the event of a complete loss of power supply. They can provide full safety without the active systems and an operator. The core catcher, one of the elements of the passive safety systems was first installed at China’s Tianwan Nuclear Power Plant of Russian design.

Rosatom is technical consultant and main equipment supplier for the construction of the Kudankulam Nuclear Power Plant.

Source : Strategic Research Institute
Bijlage:
voda
0
4911 doden uit voorzorg

Dat kernenergie dodelijk kan zijn, weten we na Tsjernobyl en Fukushima wel. Maar dat het stoppen met kernenergie ook gevaarlijk kan zijn, was nieuw voor me. Daarom viel het recente onderzoek over de Fukushima-ramp van gezondheidseconoom Matthew Neidell en collega’s van Columbia University me op.

In het jaar na Fukushima werden alle 54 nucleaire reactoren uitgezet en schakelde Japan over op elektriciteitsproductie met fossiele brandstoffen. De prijsverhoging voor elektriciteit die dat met zich meebracht, had 4911 doden tot gevolg.

0,083

Neidell schat een toename in de jaarlijkse sterftekans van een 0,083 basispunt per uur vorst per procent stroomprijsstijging.

De analyse gaat als volgt. Vanwege het krappere aanbod, steeg de prijs van elektriciteit tot wel 40% in de elektriciteitsregio’s die het meeste op kernenergie leunden (gemiddelde: 5,8%). Bijna alle verwarming in Japan is elektrisch en het stroomverbruik voor verwarming nam door de prijsstijging zichtbaar af, met name in koude periodes.

De doden die dat met zich meebracht, vielen nauwelijks op en waren vaak ook nauwelijks aan de kou te relateren. Krantenkolommen vol met doodgevroren Japanners zijn er niet, het gaat bijvoorbeeld om iets meer hartaanvallen in gebieden waar het vriest en de stroomprijs meer is gestegen.

Neidell schat een toename in de jaarlijkse sterftekans van een 0,083 basispunt per uur vorst per procent stroomprijsstijging. Dat is 0,00000083. Vermenigvuldig dat met 237 uur vorst per jaar, een 5,8% prijsstijging, een jaarlijkse sterftekans van 846 per 100.000 inwoners en een bevolking van 126,7 miljoen en statistisch gezien zijn er jaarlijks 1228 doden te betreuren als gevolg van het uitschakelen van kernenergie.

Het relevantere punt is daarom
dat een goed geïntegreerd elektriciteitsnetwerk levens redt.

Eind 2015 is Japan mondjesmaat weer begonnen met het opstarten van zijn nucleaire centrales. Nucleaire energie is CO2-neutraal en blijft toch relatief goedkoop. De publieke opinie draait ook langzaam weer bij. De vier jaar zonder kostten dus echter 4911 mensen het leven.

Dat zijn er meer dan het aantal doden dat aan de Fukushima-ramp zelf toegeschreven kan worden. De vrijgekomen straling leidt naar verwachting tot 130 kankerdoden en de evacuatie en alles daaromheen bracht 1243 doden met zich mee.

Voor Neidell en collega’s roept dat de vraag op of het uit voorzorg uitzetten van de kernreactoren wel zo’n verstandige beslissing was. En daar hebben ze ongetwijfeld een punt.

Mij valt echter op dat het onderzoek van Neidell überhaupt mogelijk was. Om de toename in de jaarlijkse sterftekans te schatten als gevolg van het uitschakelen van kernreactoren, moet de elektriciteitsprijs zich in delen van het land namelijk verschillend ontwikkelen. En dat kan alleen als het elektriciteitsnet onvoldoende transportcapaciteit heeft. Was er voldoende transportcapaciteit geweest, dan had er ongetwijfeld iemand in een regio met een lage prijs stroom gekocht om die in een regio met een hoge prijs weer te verkopen. Net zolang totdat de prijsverschillen verdwenen zijn en er een kleine stijging in het hele land resteert. Met een kleine stijging in het hele land waren de gevolgen ongetwijfeld kleiner geweest.

Het relevantere punt is daarom dat een goed geïntegreerd elektriciteitsnetwerk levens redt. Ook voor Europa lijkt me dat een wijze les.

Jasper Lukkezen is hoofdredacteur van economenblad ESB en docent aan de Universiteit Utrecht.

fd.nl/futures/1326641/4911-doden-uit-...
voda
0
ROSATOM Subsidiary Awards Contract for CONSTruction of BREST-OD-300 Fast Reactor Facility and Power Unit

ROSATOM’s TVEL Fuel Company subsidiary Siberian Chemical Plant has signed the contract with Concern Titan-2 engineering company for construction and installation works within the project of BREST-OD-300 lead-cooled fast neutron reactor facility. The total contract value is 26.3 billion rubles. The contractor will accomplish construction of reactor hall, turbine hall and related infrastructure facilities of the power plant. A 300 MW plant powered by the innovative fast reactor is the key facility of the Pilot Demonstration Energy Complex, which is in process of construction at the Siberian Chemical Plant, as a part of the strategic Russian nuclear project Proryv. In addition to the power unit, PDEC will include an on-site closed nuclear fuel cycle with a facility for fabrication and re-fabrication of mixed nitride uranium-plutonium nuclear fuel, as well as a spent fuel reprocessing facility. The completion is scheduled till the end of 2026.

Proryv or the Breakthrough project targets creation of the new technology platform for the industry with closed nuclear fuel cycle, as well as tackling the issues of spent nuclear fuel and radioactive waste. One of the project inplementations is construction of the Pilot Demonstration Energy Complex with a lead-cooled BREST-OD-300 fast neutron reactor facility with an on-site closed nuclear fuel cycle.

Source : Strategic Research Institute
Bijlage:
voda
0
Russia and the Republic of the Congo continue cooperation in the peaceful uses of atomic energy

On December 10, 2019, a delegation of the Ministry of Scientific Research and Technological Innovation of the Republic of the Congo headed by Minister M. P. E. Cussu-Mawungu arrived to Moscow by an invitation of Director General of ROSATOM Alexey Likhachev. The Congolese delegation was familiarized with capabilities and competences of the Russian nuclear industry as regards the implementation of projects to build nuclear science and technology centers and large and small nuclear generation facilities.

At the meeting, Director General of ROSATOM Likhachev and the Minister of Scientific Research and Technological Innovation of the Republic of the Congo M. P. E. Cussu-Mawungu noted the importance of the documents on the peaceful atom cooperation: the roadmap on tuning of the Russian-Congolese cooperation in the field of the peaceful uses of atomic energy and the Agreement between the Government of the Republic of the Congo and the Government of the Russian Federation Concerning the Cooperation on the Peaceful Uses of Atomic Energy.

The parties discussed practical areas of further interaction in the field of development of the nuclear infrastructure of the Republic of the Congo in the staff training and improvement of awareness of the Congolese people about nuclear technologies.

The Record signed by Alexey Likhachev and M. P. E. Cussu-Mawungu confirms arrangements of the countries to focus efforts of the parties to implement the priority project, i.e. the construction of the Nuclear Science and Technology Center in the territory of the Republic of the Congo based on Russian competences.

Source : Strategic Research Institute
voda
0
Completion of Review of Belgian Nuclear Provisions by the CNP

Synatom, of Electrabeland ENGIE, received on December 12 the decision of the Commission for Nuclear Provisions reassessing the required provisions for dismantling of Belgian nuclear power plants and nuclear waste management. As a reminder, the April 11, 2003 Belgian law mandates Synatom to manage nuclear provisions that are required to cover

the final shutdown and dismantling of nuclear power plants;
the management of nuclear waste until transferred to the Belgian National Agency for Radioactive Waste and Enriched Fissile Material (ONDRAF).

In accordance with Belgian law, nuclear provisions are re-evaluated every three years. The CNP submitted its findings on December 12, 2019 on the detailed assessment prepared by Synatom which takes into account:
the update of macroeconomic assumptions (inflation and discount rates) and expenses, (some of which will occur in more than 70 years);
the impact of the new baseline scenario for the long-term management of Category B and C nuclear waste (medium and high activity) in Belgium as agreed by ONDRAF in June 20181 ;
the scenario developed for the final shutdown and dismantling of nuclear power plants and for the management of nuclear waste on the basis of industrial experience and learnings, including in the ongoing dismantling in Germany.

Source : Strategic Research Institute
voda
0
Start of the Reactor Plant Equipment Hot Run at the Power Unit No1 of Belarus NPP

On 11 December, 2019 specialists of Power Unit No1 of Belarus NPP, the General Designer and the General Contractor Rosatom State Corporation Engineering Division, have proceeded to the reactor plant hot run the most large-scale stage of the commissioning works before physical start-up. During the hot run the specialists will check the compliance of the main equipment with the project documentation, including operation and safety requirements.

According to Mr. Vitaliy Polyanin, Vice-President and Director of Belarus NPP Construction Project of ASE EC JSC, systems, equipment, facilities, personnel, documentation of all the departments of the Customer, as well as the specialists of the organization Atomtechenergo and the General contractor are fully ready for the start of the hot run in accordance with the requirements of the Technical regulations of the safe operation of the Power Unit No.1 of Belarus NPP and the Program of commissioning works before the start-up. The works are approved by Gosatomnadzor of the Republic of Belarus.

Source : Strategic Research Institute
Bijlage:
voda
0
'Japans Kansai legt kernreactoren stil'

Gepubliceerd op 22 dec 2019 om 10:24 | Views: 533

TOKIO (AFN/BLOOMBERG) - Het Japanse energieconcern Kansai Electric Power legt komende zomer naar verwachting twee kernreactoren stil. Het gaat om reactoren in de centrale van Takahama ten noorden van Osaka die naar verwachting niet aan de anti-terrorismevereisten van de overheid voldoen, zo schrijft de krant Mainichi.

Bij de betreffende reactoren 3 en 4 worden momenten beveiligingsmaatregelen gerealiseerd, maar de aanpassingen zullen niet op tijd zal zijn voltooid voor hun respectieve deadlines in augustus en oktober, aldus de krant. Het werk loopt ongeveer een jaar achter.

Kansai Electric is ook verwikkeld in een schandaal rond Takahama. Bedrijfsfunctionarissen accepteerden eerder bijna 320 miljoen yen (2,6 miljoen euro) in contanten en geschenken om de kerncentrale in de stad te herbergen. De kwestie kostte voorzitter Makoto Yagi al zijn baan. President van het bedrijf, Shigeki Iwane, zei dat hij van plan is om te vertrekken.

Het schandaal kan de herstart van rectoren 1 en 2, die momenteel in onderhoud zijn, vertragen. Daarmee dreigt ook een tekort aan capaciteit voor stroomleveringen.
voda
0
Atkins Nuclear Secured joint venture selected for Hanford Central Plateau Cleanup Contract

SNC-Lavalin Group’s Atkins Nuclear Secured Holdings Corporation announced that Central Plateau Cleanup Company LLC, an AECOM-led joint venture with Atkins and Fluor, has been selected for the Central Plateau Cleanup Contract at the Hanford Site near Richland, Washington, from the Department of Energy. The indefinite-delivery/indefinite-quantity (IDIQ) contract is valued at USD 10 billion over 10 years. This nuclear services contract is within SNCL Engineering Services, the cornerstone of our strategy moving forward to greater growth and profitability.

The Central Plateau Cleanup Contract will achieve end state closure of facilities, waste burial sites, and groundwater remediation in the river corridor of the Hanford Reservation along the Columbia River. The scope will also include decommissioning and dismantlement of several legacy facilities on the Central Plateau of the Hanford Reservation. CPC Co will manage waste disposition activities for the on-site disposal facility as well as off-site disposal operations.

Source : Strategic Research Institute
voda
0
ROSATOM Floating Power Unit Connects to Isolated Electricity Grid in Pevek

The floating power unit Akademik Lomonosov has been connected to the grid, generating electricity for the first time in the isolated Chaun-Bilibino network in Pevek, Chukotka, Russia’s Far East. This happened after the Russian regulator Rostekhnadzor issued an operations permit, as well as permission to connect to the northern electricity grid maintained by Chukotenergo JSC. Connecting the FPU generators to the network was carried out after parameter synchronisation with the coastal network. This happened after the completed construction of the onshore facilities, ensuring the transfer of electricity from the FPUs to Chukotka’s high voltage networks. A vast amount of work was also carried out on constructing the heat supply networks. Connecting the FNPP to Pevek’s heat networks will be completed in 2020.

Once the FNPP will begin commercial operations, it will make it Russia’s 11th nuclear power plant. It will also mark the first time in Russia’s nuclear energy history that two nuclear power plants, the Akademik Lomonosov FNPP and the Bilibino NPP, operate in the same region.

Source : Strategic Research Institute
Bijlage:
voda
0
Aardbeving in de buurt van kerncentrale Iran

Een aardbeving met een kracht van 5,1 heeft vrijdagochtend Iran getroffen. De beving vond plaats in de provincie Bushehr, in de nabijheid van de enige kerncentrale van het land. Er is nog niets bekend over mogelijke slachtoffers of schade.

Buitenlandredactie 27-12-19, 04:28

Volgens het Amerikaanse seismologisch instituut USGS trof de beving het gebied om 5.23 uur lokale tijd, op een diepte van 38 kilometer.

Iraanse staatsmedia maakten niet direct melding van de aardbeving. Een aardbeving met een kracht van 5 kan aanzienlijke schade toebrengen. De kerncentrale in Bushehr zou gebouwd zijn om nog heviger bevingen te weerstaan.

Iran bevindt zich op verschillende breuklijnen, waardoor aardbevingen zeer vaak voorkomen. In 2003 trof een aardbeving de historische stad Bam, waardoor 26.000 mensen omkwamen. Ook Bam ligt in de nabijheid van de kerncentrale, maar die werd destijds niet beschadigd.

www.ad.nl/buitenland/aardbeving-in-de...
voda
0
Unit 4 of Novovoronezh NPP received a life extension license from Rostechnadzor

On December 29, the Federal Environmental, Industrial and Nuclear Supervision Service Rostechnadzor issued a second additional service life extension license for Unit 4 of Novovoronezh NPP for 13 years. Thus, the unit will serve for 60 years instead of thirty years as designed. Over 40 events, including those to improve safety, were carried out to prepare the unit to the second additional service life extension at Unit 4 with a VVER-440 reactor in the framework of the major overhaul and large-scale upgrading.

Andrey Dementiev, Deputy Director General and Director for Production and Operation of NPPs in Rosenergoatom JSC, noted “In the framework of the large-scale upgrading we have developed and implemented brand new, modern safety systems. For example, now when there is the active cooling system, the passive one can be used. It consists of special tanks with boron solution which, when necessary, gets into the reactor core and cools it down. There was no such system in the initial design of the unit. Thus, now Unit 4 is fully compliant with most modern requirements in spite of the fact that it was designed in the 1960’s of the 20th century.”

Source : Strategic Research Institute
Bijlage:
voda
0
Wie wil dat de EU in 2050 klimaatneutraal is, kan kernenergie niet op voorhand uitsluiten

Expert | Remco de Boer is adviseur op het gebied van energietransitie

Met zijn uitspraak, vorige week in NRC Handelsblad, dat kernenergie ‘niet duurzaam en bovendien hartstikke duur is’, maakte EU-commissaris Frans Timmermans korte metten met nucleaire energie als energiebron. En kernenergie kon in Brussel toch al niet op veel liefde rekenen. De Europese Commissie (EC) is vooral bezig met risico’s, radioactief afval en sluiting van centrales.

Illustratie: Hein de Kort voor Het Financieele Dagblad

Ideologisch zijn er geen bezwaren, aldus Timmermans, die binnen de EC verantwoordelijk is voor de Green Deal die de EU vanaf 2050 klimaatneutraal moet maken. Volgens hem gaat het om een puur zakelijke afweging: in tegenstelling tot wind- en zonne-energie, waarvan de prijs daalt, is kernenergie gewoon duur, hartstikke duur.

Het is inderdaad een feit dat de bouw van de huidige generatie kerncentrales in het Westen goud geld kost. Tegenstanders wijzen op de drie centrales die in Europa in aanbouw zijn — in Frankrijk, Finland en het Verenigd Koninkrijk — en dan vooral op hun enorme kostenoverschrijdingen.

Toch is een hoge prijs alleen geen tegenargument. Iets wat nu ‘duur’ is, kan op termijn toch kosteneffectief blijken. Een kerncentrale bouw je voor zestig tot tachtig jaar. Tegen die tijd kan iets wat nu ‘goedkoop’ is, duurkoop blijken.

Als ‘hartstikke duur’ doorslaggevend was geweest, was Nederland nooit aan windparken op zee begonnen. In 2013 waren die met € 0,15 per kilowattuur een van de allerduurste opties. Met een unieke aanpak hebben overheid en markt die prijs samen zo ver naar beneden gekregen dat inmiddels geen subsidie meer nodig is.

China

‘Duur’ is dus geen natuurverschijnsel. Kosten worden vooral bepaald door hoe graag de politiek iets wil. Of niet. China heeft 48 kernreactoren, bouwt er op dit moment nog eens negen en het land investeert veel in de ontwikkeling van een nieuwe generatie kerncentrales. China wil graag meer kernenergie. De EU niet.
Hoe gek het ook klinkt, of kernenergie nu duur is en wind en zon niet, doet er eigenlijk niet zoveel toe. Als het over kosten gaat, is de hamvraag niet wat de onderdelen kosten, maar hoe het totale energiesysteem eruit komt te zien, en wat dat kost. Daar gaat het nu zelden over.

Zo worden bij de prijs van wind en zon vrijwel altijd de kosten van de benodigde back-up buiten beschouwing gelaten. Oftewel kosten voor waar je je energie vandaan haalt als het niet waait en de zon niet schijnt.

Die back-up is nu nog geen issue. Er staan nog meer dan genoeg gas- en kolencentrales en zon en wind hebben in de Europese elektriciteitsvoorziening pas een aandeel van 16%. Maar in 2050, als we een energiesysteem zonder CO2-uitstoot hebben waarin wind en zon de overhand hebben, wordt dat een heel ander verhaal.

Als ‘hartstikke duur’
doorslaggevend was geweest, was Nederland nooit aan windparken op zee begonnen
Hoe dat energiesysteem er precies uit komt te zien, weten we niet. Maar bij de presentatie van de World Energy Outlook afgelopen najaar, benadrukte het Internationale Energie Agentschap (IEA) dat de wereld nauwelijks nog kieskeurig kan zijn op welke CO2-vrije bronnen en -technieken het wel en niet wil inzetten. Althans, niet als we een kans willen maken om de temperatuurstijging op aarde tot maximaal 2 en liefst 1,5 graden Celsius te beperken, zoals is afgesproken in het Klimaatakkoord van Parijs.
Kernenergie is met een aandeel van 25% nu niet alleen de grootste bron van elektriciteit in de EU, maar daarmee ook de grootste CO2-vrije bron. Dat aandeel loopt terug en zal nog verder teruglopen. Zo sluit Duitsland binnenkort alle kerncentrales, maar laat de bruin- en steenkoolcentrales open, mogelijk tot 2038. België wil de nucleaire deuren in 2025 sluiten en kijkt voor vervanging nadrukkelijk naar gascentrales. Fossiele energie dus.

Wie geen kernenergie wil, moet wat anders. Zon en wind, uiteraard, maar alleen daarmee redden we het niet. En waartoe je ook besluit, alles heeft nadelen. Dat zien we ook in eigen land.

Bij de keuze tussen biomassa en aardgas kiest D66 inmiddels voor aardgas. Die partij vindt biomassa, een beoogd vervanger van fossiele energie, allesbehalve duurzaam.
Blijven we fossiele energie gebruiken, en de kans dat dit nodig is, is zeer groot, dan zal de CO2-uitstoot daarvan moeten worden afgevangen en opgeslagen. Ook daartegen wordt flink geageerd, vooral door natuur- en milieuorganisaties.

Ideologische bril

Zelfs bij de duurzaamheid van zon en wind kun je vraagtekens zetten. Hoe ‘duurzaam’ is het om een fors deel van de Noordzee vol te zetten met windmolens? Of hoe duurzaam zijn zonneparken van honderd voetbalvelden groot. Niet voor niets is de Tweede Kamer ook daartegen inmiddels in het geweer gekomen.
De realiteit is dat wie wil dat de EU in 2050 inderdaad klimaatneutraal is, zich niet kan permitteren om welke energiebron of techniek dan ook op voorhand uit te sluiten. Ook kernenergie niet. Wie dat wel doet, moet op z’n minst aangeven met welke bronnen hij of zij de klus dan wel wil klaren. En wat dat kost.

Makkelijke keuzes zijn er niet. Het debat over de radicale reductie van de Europese CO2-uitstoot moet niet gaan over gedroomde, ideale oplossingen waar iedereen voor is. Die alleen zijn niet genoeg, als ze al bestaan. Dat debat moet gaan over welke nadelen je onder welke voorwaarden accepteert van de oplossingen die je liever niet wilt. Sweeping statements als die van Timmermans passen daar niet bij.

Wie simpelweg stelt dat kernenergie ‘niet duurzaam en bovendien hartstikke duur is’ laadt de verdenking op zich wel degelijk door een ideologische bril te kijken. In elk geval wordt de enorme complexiteit van de opgave waarvoor de wereld staat ermee ontkend.

Remco de Boer is onderzoeker, adviseur en publicist op het gebied van de energietransitie. Reageer via expert@fd.nl.

fd.nl/opinie/1331084/wie-wil-dat-de-e...
Bijlage:
voda
0
Russian NPPs Set New Record for Electric Power Output in 2019
Image Source: rosatom.ru

In 2019, the Russian nuclear power plants, affiliate companies of the Rosenergoatom Joint-Stock Company, set a new electric power output record over 208.784 billion kilowatt-hours, which means they have grown their joint production and exceeded their previous record of 2018 (204.275 billion kWh) by over 4.5 billion kWh. The FAS assignment for 2019 has been delivered at the rate of 103% with the planned production of 202.7 billion kWh.

The biggest contributions into the new Company’s record were from the Rostov (over 33.8 billion kWh), the Kalinin (over 31 billion kWh), and the Balakovo NPPs (over 30 billion kWh).

Source : Strategic Research Institute
Bijlage:
847 Posts, Pagina: « 1 2 3 4 5 6 ... 22 23 24 25 26 27 28 29 30 31 32 ... 39 40 41 42 43 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

AEX 865,36 +0,01 +0,00% 18 apr
AMX 926,60 +7,92 +0,86% 18 apr
ASCX 1.189,83 -18,08 -1,50% 18 apr
BEL 20 3.826,58 +32,01 +0,84% 18 apr
Germany40^ 17.751,90 -85,50 -0,48% 18 apr
US30^ 38.013,46 0,00 0,00% 18 apr
US500^ 5.049,25 0,00 0,00% 18 apr
Nasd100^ 17.548,80 0,00 0,00% 18 apr
Japan225^ 38.001,71 0,00 0,00% 18 apr
WTI 82,08 -0,13 -0,16% 18 apr
Brent 86,99 -0,32 -0,37% 18 apr
EUR/USD 1,0643 -0,0028 -0,26% 00:35
BTC/USD 63.654,14 +2.401,20 +3,92% 00:35
Gold spot 2.380,07 +19,08 +0,81% 00:35
#/^ Index indications calculated real time, zie disclaimer
HOGE RENDEMENTEN OP DE IEX-MODELPORTEFEUILLES > WORD NU ABONNEE EN PROFITEER VAN MAAR LIEFST 67% KORTING!

Stijgers & Dalers

Stijgers Laatst +/- % tijd
RANDSTAD NV 48,350 +1,250 +2,65% 18 apr
ING 15,168 +0,242 +1,62% 18 apr
ArcelorMittal 23,800 +0,290 +1,23% 18 apr
Dalers Laatst +/- % tijd
ASMI 544,800 -35,400 -6,10% 18 apr
BESI 138,550 -3,800 -2,67% 18 apr
ASML 840,300 -12,100 -1,42% 18 apr

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront