voda
0
Wärtsilä to Convert Brazilian Power Plant to run on Gas

The technology group Wärtsilä will convert a Brazilian power plant to 100 percent natural gas operation, while at the same time increasing its output from 85 MW to 92 MW. The conversion will reduce the plant’s operational costs, and lessen its environmental impact. The contract with Companhia Energética Manauara is for the Manauara power plant in Manaus, Brazil, and was signed in July 2020. The power plant will supply energy to the national grid.The conversion will involve converting the existing five Wärtsilä 46GD dual-fuel combustion engines to five Wärtsilä 50SG gas fueled engines, along with the required common system upgrades. The improved plant performance will raise its overall competitiveness. In addition to the conversion, the two companies have renewed an operation and maintenance agreement for ten years. The service agreement has power plant performance guarantees related to heat rate, electrical capacity, lube oil consumption, spare parts consumption and plant availability.

The use of natural gas fuel will reduce the plant’s environmental footprint by approximately 10 percent, representing some 35,000 Metric Tons of Carbon Dioxide Equivalent per year. This is the equivalent of the pollution from some 7600 cars.

The conversion is scheduled to be fully completed in the beginning of 2022. Wärtsilä has earlier successfully completed a number of gas conversion projects involving more than 100 Wärtsilä gas engines and totaling more than 1.2 GW in output.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Beursblik: UBS zet Engie op kooplijst

FONDS KOERS VERSCHIL VERSCHIL % BEURS
Engie
12,215 0,465 3,96 % Euronext Paris
Engie next PDF 2023
12,215 0,465 3,96 % Euronext Paris
Engie SA
12,185 0,44 3,75 % Gruppo Borsa Italiana

(ABM FN) UBS heeft het advies voor Engie verhoogd van Neutraal naar Kopen en stelde het koersdoel opwaarts bij van 10,75 naar 15,00 euro. Dit bleek donderdag uit een sectorrapport van de Zwitserse bank.

Het aandeel bleef dit jaar achter op sectorgenoten.

Volgens de analisten zijn de coronarisico's inmiddels wel ingeprijsd, maar kent de markt nog te weinig waarde toe aan de nieuwe desinvesteringsplannen van Engie. Ook zijn er positieve signalen voor de balans en wil Engie de groei weer aanjagen.

Indien Engie de prestaties van sectorgenoten als Enel en Iberdrola weet te kopiëren, dan kan Engie volgens UBS wel eens de best presterende in de sector worden.

Het aandeel Engie noteerde donderdag 3,8 procent hoger op 12,20 euro.

Door: ABM Financial News.
pers@abmfn.be
Redactie: +32(0)78 486 481

© Copyright ABM Financial News B.V. All rights reserved.
voda
0
Elektriciteitsverbruik op laagste punt in bijna 20 jaar

Het elektriciteitsverbruik in Nederland heeft het laagste punt in bijna twintig jaar bereikt. In het tweede kwartaal van 2020, midden in de coronacrisis, kwam het elektriciteitsverbruik uit op 24,8 miljard kWh, 7% lager dan hetzelfde kwartaal in 2019.

Het elektriciteitsverbruik in Nederland is al jaar op jaar stabiel, dus een daling van 7% is fors, zegt econoom Frank Notten van het Centraal Bureau voor de Statistiek, dat woensdag een analyse van het stroomverbruik publiceerde. 'Sinds 2001 hebben we niet meer zo'n laag verbruik in het tweede kwartaal in Nederland gehad.' Ook in andere kwartalen was het verbruik de afgelopen jaren niet zo laag, zo laten eerdere CBS-cijfers zien.

Het CBS heeft nog niet in kaart kunnen brengen in welke sectoren het verbruik het meest daalde, die data komen later.

Meer export naar Duitsland
Ook de productie van stroom daalde in het tweede kwartaal, namelijk met 1%. Dat is aanzienlijk minder is dan de daling van het stroomverbruik. Dat komt omdat in het tweede kwartaal veel stroom naar Duitsland is geëxporteerd, zegt Notten.

Duitsland heeft elektriciteitscentrales die draaien op kolen, maar op dit moment is de kolenprijs hoog. Nederland daarentegen heeft gascentrales die elektriciteit maken en aangezien de aardgasprijs al maanden laag is, heeft Duitsland de goedkopere stroom uit Nederland gekocht. Een andere factor die de elektriciteitsproductie uit kolen drukt is de huidige hoge CO2-prijs.

Stijging van zon- en windenergie
Het CBS presenteerde woensdag ook cijfers over de productie van hernieuwbare stroom. In de eerste helft van 2020 is de productie van elektriciteit uit hernieuwbare bronnen met 39% gestegen ten opzichte van het eerste half jaar in 2019. Dat komt omdat er veel nieuwe zonneparken zijn opgeleverd en vrij zonnig was, zegt Notten. Hiermee is het aandeel van hernieuwbare bronnen in de elektriciteitsproductie groter dan steenkool, een trend die ook in 2019 zichtbaar was.

Met grafieken, zie link:

fd.nl/economie-politiek/1356468/elekt...
voda
0
GE Secures HA Gas Turbine Order for Zainskaya Power Plant in Tatarstan in Russia

GE announced that it has secured an order to supply power generation equipment for a new generating block at JSC Tatenergo’s Zainskaya State District Power Plant located in Zainsk in Tatarstan Republic in Russia. The new combined cycle plant will be designed and built by the Turkish engineering, procurement, and construction company ENKA, as part of the modernization project of one of the largest power plants in Tatarstan. GE will supply equipment for the project including GE’s most efficient gas turbine 9HA.02, as well as a STF-D650 steam turbine, one triple pressure with RH Heat Recovery Steam Generator and H78 and A78 generators.

The new 858 MW CCGT power plant will benefit from the technology capable of reaching more than 64% net combined cycle efficiency. GE was recognized with two world records for the most efficient combined cycle power plants. When construction of the new power plant is complete, Zainskaya SDPP is expected to become one of the most efficient power stations in Russia.

Zainskaya SDPP was built in the 1960s and is one of the largest combined heat and power plants in Russia today, with a capacity of 2.2 GW. The plant connects Russia’s European energy system with the energy systems in the Urals and Siberia regions, and generates approximately 25% of the power consumed in Tatarstan, including the Republic’s capital city Kazan. Replacing some of the plant’s outdated steam units with the latest 9HA gas turbine technology will significantly increase the efficiency of the power plant, reduce the natural gas consumption and emissions, while also driving down the cost of electricity.

Source : STRATEGIC RESEARCH INSTITUTE
Bijlage:
voda
0
Vattenfall heeft nieuwe CEO

(ABM FN-Dow Jones) Vattenfall heeft een nieuwe CEO en voorzitter in de persoon van Anna Borg, die tot aan haar benoeming CFO is van het moederbedrijf van onder meer het Nederlandse nutsbedrijf Nuon.

Borg is per 1 november van dit jaar de opvolgster van Magnus Hall, die in juli van dit jaar aankondigde het concern te verlaten.

Vattenfall start per direct met de zoektocht naar een nieuwe CFO.

Door: ABM Financial News.
info@abmfn.nl
Redactie: +31(0)20 26 28 999

© Copyright ABM Financial News B.V. All rights reserved.
voda
0
Australia’s Gas & Coal Demand for Power Has Peaked

Rystad Energy analysis shows that Australia’s top two electricity generation sources, coal and natural gas, have both seen demand in the country peak. The combined power production from coal and gas will be overtaken by electricity generated by solar photovoltaic and onshore wind farms from 2026. In fact, installed power generation capacity from solar and wind top that of coal and gas already from 2023, but transmission limitations will prevent some of the electricity produced from these clean energy sources from reaching urban centers and cities.

Coal has been the king of fuels in Australia’s power generation history, but its share in the domestic generation mix has declined steadily from 83% in the year 2000. This year alone Rystad Energy expects Australia’s coal-to-power generation to decline 2.6% from 2019 to 145.67 terawatt-hours (TWh). The slide is likely to dip below 100 TWh already after 2024 and will continue in the years thereafter.

Gas-fired power generation, on the other hand, has kept rising in the past decade to a peak of 55.33 TWh in 2017, and was little changed at 54.36 TWh last year. Rystad Energy expects these levels will soon be a thing of the past, however, as we forecast gas-fired power generation to fall to 45.64 TWh in 2020 and to continue dropping every year until the end date of the analysis in 2040.

Australia’s overall power generation is forecast to slip to 263.88 TWh in 2020 from 265.23 TWh in 2019 as a result of lower electricity consumption during the Covid-19-related lockdowns. From 2021 onwards we expect an uninterrupted annual rise in Australia’s electricity generation all the way to 2040.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
ACM: investeringsplannen netbeheerders in elektriciteitsnet onvoldoende uitgewerkt, tekort transportcapaciteit houdt aan

De ACM heeft tijdens de eerste toets van de investeringsplannen de netbeheerders gevraagd hun plannen aan te passen. Op sommige onderdelen vond de ACM de investeringsplannen nog onvoldoende uitgewerkt.

Met ingang van 2020 toetst de Autoriteit Consument & Markt (ACM) de investeringsplannen die netbeheerders van elektriciteits- en gasnetwerken elke 2 jaar moeten maken. In de plannen staat welke investeringen in de netwerken nodig zijn om te voldoen aan de toekomstige vraag naar energie. Netbeheerders Coteq, Enexis, Enduris, Liander, Stedin, Rendo, TenneT en Westland Infra presenteerden afgelopen mei hun concept-investeringsplannen voor uitbreiding van het elektriciteitsnet voor de periode tot 2030.

Plannen voldoen nog niet aan eisen
Op sommige onderdelen vond de ACM de investeringsplannen dus nog onvoldoende uitgewerkt. Inmiddels zijn verbeteringen doorgevoerd in de onderbouwing van de plannen, maar de plannen voldoen nog niet aan alle eisen.

De ACM meldt hierbij wel dat deze eerste ronde van toetsen voor alle partijen een nieuw traject was. Verdere verbetering van de plannen zou in deze fase veel tijd kosten, terwijl de netbeheerders ondertussen al zijn begonnen met de voorbereiding voor de volgende ronde in 2022. Daarom kiest de ACM voor een traject met de netbeheerders om de volgende plannen, die zij op 1 januari 2022 moeten indienen, verder te verbeteren. De ACM stelt vanuit haar expertise verder in gesprek te gaan met netbeheerders en stakeholders om vanuit een integraal beeld van de problematiek oplossingen te vinden voor investeringszekerheid op langere termijn.

Nog 5 tot 10 jaar problemen met transportcapaciteit
De toets van de ACM laat zien dat het huidige tekort aan transportcapaciteit dat zich op meerdere plaatsen in de elektriciteitsnetten voordoet, de komende 5 tot 10 jaar nog zal aanhouden. Netbeheerders Liander, Enduris, Enexis en TenneT kunnen niet alle investeringen die noodzakelijk zijn voor de oplossing van het tekort, tijdig realiseren. Dat kan volgens de ACM de voortgang van de energietransitie vertragen.

De ACM heeft over de investeringsplannen en haar bevindingen een brief geschreven aan de minister van Economische Zaken en Klimaat (EZK). Manon Leijten, bestuurslid ACM: ‘We constateren dat de huidige investeringsplannen van de netbeheerders het tekort aan transportcapaciteit de komende jaren niet oplossen. Dat is zorgelijk, want het kan de voortgang van de energietransitie vertragen. Nadere inspanningen van alle partijen zijn dus nodig om de transitie te laten slagen.’

Tekort neemt toe
De problematiek rond een grotere vraag dan aanbod van transportcapaciteit neemt volgens de ACM de komende jaren zelfs alleen maar toe, omdat op veel plaatsen de timing van de voorgenomen investeringen in het elektriciteitsnet achterblijft bij de voorspelde vraag. Netbeheerders kunnen dit in sommige gevallen tijdelijk oplossen door operationele maatregelen, zoals congestiemanagement. Maar ook dit is volgens de ACM niet zonder gevolgen. Bijvoorbeeld producenten van duurzame energie kan tijdelijk transportcapaciteit geweigerd worden. Of netbeheerders voldoen niet direct aan de aanvullende vraag naar transportcapaciteit die uit plannen van regionale overheden voortvloeit. Er is volgens de ACM geen snelle oplossing voor het capaciteitsprobleem, maar de organisatie onderstreept het belang van een gezamenlijke inspanning voor het vinden van oplossingen op de langere termijn.

Door Edwin van Gastel, Marco de Jonge Baas

solarmagazine.nl/nieuws-zonne-energie...
voda
0
Liander neemt in Friesland eerste van reeks nieuwe elektriciteitsstations in gebruik

Liander heeft in Friesland een van de vele nieuwe elektriciteitsstations in gebruik genomen die de provincie in de komende jaren verwelkomt om de energietransitie te faciliteren en de huidige congestie te verhelpen.

Liander meldde in de afgelopen maand op meerdere plaatsen in Nederland congestie verholpen te hebben. In Wolvega is dat het directe gevolg van de ingebruikname van het vernieuwde elektriciteitsverdeelstation.

Ruimte voor nieuwe zonneparken
Door de snel gestegen vraag naar stroom was het afgelopen jaar de maximale beschikbare capaciteit van het station bereikt. Dankzij de 2 gigantische nieuwe transformatoren is de capaciteit van het station meer dan verdubbeld en kunnen tot in de verre omtrek nieuwe bedrijven en zonneparken aangesloten worden.

Problemen met het steeds voller rakende elektriciteitsnet kent Liander overal in de provincie Friesland, waaronder in de gemeente Weststellingwerf. Dat komt enerzijds door de groei van het aantal woningen en bedrijven die steeds meer stroom afnemen. Daarnaast heeft de toegenomen mobiliteit ervoor gezorgd dat ProRail meer elektriciteit voor extra treinen van het elektriciteitsverdeelstation in Wolvega vraagt. Anderzijds groeit het aantal wind- en zonneparken in de regio dat groene stroom aan het elektriciteitsnet wil terugleveren snel. Door deze ontwikkelingen heeft het elektriciteitsstation in Wolvega 1,5 jaar geleden zijn maximale capaciteit bereikt, waardoor een handvol klanten moest wachten op uitbreiding van het station.

Hart van de stroomvoorziening
De afgelopen periode heeft het elektriciteitsstation in Wolvega een grondige verbouwing ondergaan, zijn installaties vernieuwd en zijn de 2 oude transformatoren van 20 megawatt vervangen door transformatoren van 50 megawatt. Deze transformatoren hebben de capaciteit om de groene stroom van ongeveer 100 voetbalvelden met zonnepanelen te verwerken of stroom te leveren aan ongeveer 35.000 huishoudens. Hiermee is het hart van de stroomvoorziening in de regio weer klaar voor de toekomst.

Bijzonder aan het station in Wolvega is dat het in een woonwijk ligt. Omwonenden zijn in de doorontwikkeling van het nieuwe station meegenomen tijdens inkijkmiddagen, bewonersavonden en door middel van nieuwsbrieven.

Ook in veel andere delen van Friesland breidt Liander het stroomnet uit. Alleen in 2020 investeert de netbeheerder al ruim 800 miljoen euro in het Friese net. Zo werkt Liander onder meer aan de uitbreiding van elektriciteitsverdeelstations in Dokkum en Oudehaske en legt de netbeheerder een nieuwe elektriciteitskabel naar Ameland.

Door Marco de Jonge Baas

solarmagazine.nl/nieuws-zonne-energie...
voda
0
Waste-to-Energy Project in Maldives Gets AIIB Support

As an island state, the Maldives does not have a lot of land to waste. Eighty percent of its total land area is distributed among 1,200 coral islands, of which only 188 are inhabited, many are remote, and nearly all are physically vulnerable to rising sea levels. The Maldives created the artificial island of Thilafushi some 30 years ago to serve as a dumpsite for the waste generated in the Greater Malé capital region. As the Maldives’ economy is based mainly on tourism and fisheries, both of which rely heavily on a pristine environment, a more sustainable solution to the garbage problem had to be found.

In response, the Government of Maldives, with support from the Asian Infrastructure Investment Bank and other multilateral development banks, is putting up a sustainable regional solid waste treatment system in the Greater Malé region. It has the goal of ensuring the safe disposal or recycling of waste, reducing the greenhouse gas emissions of the island state, and generating electricity from waste-to-energy. The facility is intended to handle 500 tons of waste per day and convert it to electricity, which is eventually expected to generate eight megawatts of surplus electricity by the end of 2024.

AIIB has approved a USD40-million loan for the Greater Malé Waste-to-Energy Project, which is being co-financed by the Asian Development Bank (ADB) and the Japan Fund for the Joint Crediting Mechanism.

This is the second AIIB loan to the Maldives, the first being a loan under AIIB’s COVID-19 Crisis Recovery Facility to help the country with its Emergency Response and Health Systems Preparedness Project against COVID-19.

Because the country is at great risk of rising sea levels due to climate change, as well as natural disasters like tsunamis and extreme climate events, the project design incorporates disaster-and climate-resilient features such as raised floor elevations, and flood-proof mechanical and electrical equipment. The cost estimates and implementation schedule also accommodate possible delays or cost increases due to the impact of COVID-19 on supply chains.

The project includes a capacity building component to help government officials manage the project and conduct environmental monitoring. In addition, targeted public awareness campaigns in the main population centers of Malé, Hulhumale, and Villimale will be provided to raise awareness of the new waste collection and waste management system, and 3R (Reduce, Reuse, and Recycle) behaviors to support a clean environment.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Ncondezi Energy Project Unaffected

Following the announcement on the 22 September 2020 Ncondezi Energy Limited has held discussions with GE Steam Power and China Machinery Engineering Corporation regarding the Ncondezi 300MW power project and confirmed that it has not received any notice of change to the Joint Development Agreement signed in July 2019. In the event that a new technology partner is required, CMEC has put in place a contingency plan and compiled a preferred list of partners who are familiar with the Project. CMEC has indicated that such a process would take 1 month to complete if required.

In the meantime there is no change to the timeline for critical Project work streams, including the historical cost audit and tariff negotiations, which are progressing positively.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
ENGIE Inaugurates Technology Research Center in Stains

Jean-Pierre Clamadieu, ENGIE Chairman of the Board, Claire Waysand, ENGIE interim CEO, Azzédine Taïbi, Mayor of Stains, Bernard Larrouturou, Head of Research & Innovation Division representing Frédérique Vidal, Minister of education and research, and Eric Cesari, Vice President of the Grand Paris Metropolis inaugurated the ENGIE Group's new research center in Stains (Seine-Saint-Denis): ENGIE’s CRIGEN Lab. ENGIE’s CRIGEN Lab is the ENGIE Group's corporate research and development (R&D) center. ENGIE CRIGEN Lab is located on Urban Valley Campus site, winner of the first edition of “Inventons la Métropole du Grand Paris”. It is the most advanced project in the competition, and won the 2020 MIPIM Award in the "Best futura mega project" category. Initially located in Saint-Denis, ENGIE’s CRIGEN Lab has recently moved to Stains into an eco-designed building.

The research center comprises 200 researchers representing 11 different nationalities. Among them, 50 researchers have doctorate degrees and around 20 are undertaking PhDs as high-level specialists in green gases, new energy uses and technologies of the future.

The researchers at ENGIE’s CRIGEN Lab are undertaking operational R&D projects and are developing industrial pilot projects in France and Europe, to hone their expertise in low-carbon technologies and to help projects to reach maturity. They are supported by a whole R&D ecosystem (European universities, manufacturers, start-ups, laboratories, etc.), and use testing facilities that are unique in Europe.

The research work is structured around three main themes:
Low-carbon energies and in particular green gases (hydrogen, biogas, etc.)
Intelligent and efficient energy consumption in cities, buildings and industry 4.0
Emerging technologies essential for the energy transition (artificial intelligence, nanotechnologies, robots and drones, etc.).

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Tennet zoekt op zee naar defect in Deense kabel

De splinternieuwe kabel is 325 kilometer lang, kostte ruim €600 mln en is sinds dit weekend defect: de Cobrakabel die Nederland verbindt met Denemarken. Zeker is dat de stroomkabel, vorig jaar opgeleverd, er zo'n drie maanden uit ligt.

Dat meldt netbeheerder Tennet, na eerdere berichtgeving door vakblad Energeia. Dit weekend is ergens in de kabel iets stuk gegaan. Tennet, 100% in handen is van de Nederlandse staat en eigenaar van het hoogspanningsnet, heeft eerst onderzocht of de storing aan land is ontstaan of rond het hoogspanningsstation. Dat bleek niet het geval.

Schip uitvaren
'Wij zijn gisteren met de eerste indicatieve metingen vanaf land gestart', zegt een woordvoerder. Tennet stuurt een toon of een puls door de kabel om te onderzoeken waar ongeveer het defect in de kabel zit. Vervolgens zal er, mogelijk nog deze week, een schip uitvaren om op zee en dichtbij de vermoedelijke foutlocatie nogmaals een toon of een puls door de kabel sturen, om de exacte foutlocatie te bepalen.

Daarbij kijkt Tennet ook naar de oorzaak: of er bijvoorbeeld een ankersporen zichtbaar zijn op de kabel. De stroomkabel lag minstens anderhalve meter in de zeebodem. Als de exacte foutlocatie is ontdekt wordt de kabel uitgegraven, gerepareerd, getest en uiteindelijk opnieuw ingegraven.

In- en uitvoer
Tennet verwacht dat de reparatie tweeënhalve maand tot drie maanden gaat duren. In die tijd ligt de kabel er helemaal uit, en zal er dus geen stroom van en naar Denemarken gaan. De Cobrakabel loopt vanaf de Eemshaven via Duitsland naar Endrup.

Nederland kan door de kabel goedkope Deense stroom invoeren. Andersom, wanneer in Denemarken de stroomprijzen hoger zijn dan hier, kan elektriciteit dus worden geëxporteerd naar Endrup en verder. De Cobrakabel heeft een vermogen van 700 MW.

Zeer kostbaar
Tennet kan nog niet zeggen wat deze reparatie gaat kosten. Zeker is wel dat de kabels op zee zeer kostbaar zijn. Tennet heeft ook de windparken voor de Zeeuwse kust aangelegd. Daar werd gerekend op tussen de €2,5 mln tot €3 mln per kilometer, inclusief de installatie en het leggen van die kabel.

Maar zelfs wanneer de herstelwerkzaamheden uitdraaien op een miljoenenproject, is dat niet iets wat Tennet - en daarmee uiteindelijk de belastingbetaler - zal voelen. 'We zijn hier voor verzekerd', zegt de woordvoerder. Naast de Cobra heeft Nederland ook nog verbindingen met Engeland en Noorwegen. De Nordnedkabel naar Noorwegen is eerder tweemaal uit bedrijf geweest: een keer vanwege problemen met de kabel in zee, en keer vanwege haperingen aan land bij de dijk in de Eemshaven.

fd.nl/ondernemen/1358994/tennet-zoekt...
voda
0
TenneT en Alliander breiden elektriciteitsnetten uit

Gepubliceerd op 1 oktober 2020 12:01 | Views: 117

AMSTERDAM (AFN) - TenneT heeft twee investeringsplannen gepubliceerd voor de komende tien jaar om de elektriciteitsnetten op land en op zee uit te breiden. Ook netwerkbedrijf Alliander gaat de komende tien jaar het elektriciteitsnet uitbreiden in vier provincies.

De groeiende industrie, agrarische sector, elektrisch vervoer en duurzame woonwijken vragen steeds meer elektriciteit, en daarom is op veel plekken minstens een verdubbeling van de capaciteit van het net nodig. Netwerkbedrijf Alliander gaat de komende tien jaar het elektriciteitsnet uitbreiden in Friesland, Noord- en Zuid-Holland, Flevoland en Gelderland. Het bedrijf gaat er onder meer nieuwe stations bouwen, bestaande stations uitbreiden en nieuwe en dikkere kabels leggen.

Volgens TenneT leiden alle plannen tot "een enorme opgave voor alle netbeheerders". Er is volgens het bedrijf namelijk een "mismatch" in de snelgroeiende vraag naar uitbreidingen van het elektriciteitsnet en de mate waarin dit in hetzelfde tempo kan worden gerealiseerd. "We moeten er rekening mee houden dat die mismatch nog een aantal jaren voortduurt".

TenneT benoemt dat er in 2030 een aantal capaciteitsknelpunten kunnen ontstaan, doordat ofwel de productie of de belasting (de elektriciteitsvraag) te hoog is. Daarom moeten de netten verzwaard worden. Op het land investeert Tennet in de periode van 2020 tot 2029 naar verwachting tussen 7,8 miljard en 8,7 miljard euro. In diezelfde periode investeert de beheerder naar verwachting tussen 6 miljard en 7,2 miljard euro in de aanleg van het net op zee.
voda
0
EDF Welcomes Regulator’s Permission for Hunterston B Restart

Hunterston B Station Director Paul Forrest said “I welcome the ONR’s decision to approve the restart of Hunterston B power station’s other reactor. Having both reactors back online will mean that Hunterston B can continue the important job of making low carbon electricity and help reduce reliance on gas-powered generation until the site moves into defuelling by January 2022. We have carried out the most detailed investigation ever on this kind of reactor and the approved safety case has been subject to extensive scrutiny and testing, by EDF and independently. We have been able to demonstrate that even in the most extreme conditions our reactors will safely shutdown, including in the event of an earthquake larger than ever experienced in the UK.”

Hunterston B is one of a fleet of 7 Advanced Gas-cooled Reactors around the coast of Britain that, whatever the weather conditions, have reliably provided around 15% of the country’s power supply over the last 3 decades.

On 27 August 2020, EDF announced that generation at Hunterston B power station would end no later than 7 January 2022.

On 27 August 2020, Reactor 3 at Hunterston B was granted permission to return to service for a run of approximately six months. This was following a rigorous independent assessment by the regulator, the ONR. It had been offline since March 2018 when it was taken off for graphite inspections.

Reactor 4 at Hunterston B was taken offline in October 2018 for graphite inspections. In August 2019 the ONR granted permission for the reactor to be returned to service for a period of approximately four months. The reactor had a safe, continuous run from August-December 2019 during which time it generated enough electricity to power more than 300,000 homes. Today, the regulator has granted permission for a run of approximately six month runs for this reactor.

EDF is planning for a further, final, run of six months from each of the station’s two reactors. This will be subject to regulatory approval.

Hunterston B started generating in 1976. When EDF acquired the power station it was expected to end generation in 2016. In 2012, EDF announced that the estimated end of generation would be extended to 2023, with a +/- 2 years proviso. Since it started generating low carbon electricity in 1976 Hunterston B power station has produced enough electricity to power the whole of Scotland for eight years.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
CNR & PSTS Open Research Center in Former Enel Augusta Power Plant in Sicily

New lease on life for the former Augusta thermoelectric power plant is achieved after an agreement was signed by Enel, Italy’s National Research Council, through its Department of Engineering, ICT and Technology for Energy and Transport and The Science and Technology Park of Sicily. With this agreement, a research center dedicated to sustainable reclamation and mitigation of environmental impacts of power generation plants and their related infrastructures will be established in areas of the plant that are no longer in use. The facility, due to be completed in 2021, will be made available to researchers at the Institute for Advanced Energy Technologies 'Nicola Giordano' of CNR and The Science and Technology Park, with the aim to strengthen Italian scientific research and create an internationally-renowned center.

As far as research into sustainable remediation is concerned, the aim is to create a center of excellence by providing facilities and technologies and the possibility to carry out studies through the replication of specific site conditions in the laboratory. In this way, the parties will be able to provide new solutions for continuing decommissioning and transition activities in the energy sector internationally, an interdisciplinary research area with high scientific, social and economic potential. Other studies will concern the integration between cultivating crops and power generation activities, such as in agrivoltaic applications, and the reuse of plants used in phytoremediation processes, a natural remediation technology.

In addition to the laboratories where the experiments will take place, the Augusta Research Center will have offices, a conference room and all the necessary elements to make it an autonomous center. From the energy point of view, the Center will come with a large photovoltaic panel covered roof, a solar thermal panel system for the production of domestic hot water and a heat pump system for cooling and heating the building.

The construction of the research center managed by CNR and The Science and Technology Park of Sicily completes the redevelopment of the site. Additional parts of the former oil-fired thermoelectric power plant have been or are being converted to the production of energy from renewable sources and into warehousing and storage areas. Given the architectural value of the plant, the conversion process was carried out while safeguarding the historical-industrial heritage and the buildings. Further improvements are currently under consideration in terms of industrial archaeology.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Iberdrola Creates Global Smartgrid Innovation Hub

Iberdrola believes that the transition towards a new energy model, based on electrification and the incorporation of more renewables, requires accelerating investments in electricity distribution networks. In order to respond to the challenges and to lead innovation in networks infrastructure, the company has announced the launch of a Global Smartgrid Innovation Hub. The hub will act as a platform for driving innovation, combining its technological capabilities with that of suppliers, collaborators and startups from all across the world.

In the context of a green recovery, the hub is designed to support cutting-edge projects in smart grid technologies that will benefit local industries, promote global innovation, and attract investment to enhance the growth of communities.

The innovation hub, located in Spain at the company's Distribution Operation Center in Bilbao, will start operating in the spring of 2021. Iberdrola has already identified more than 120 innovation projects worth €110 million. The lines of work, which are international in scope, will enable the development and deployment of innovative solutions to the company's electricity network activities throughout the world.

The initiative will involve the collaboration of more than 200 professionals to develop R+D+i projects related to the new challenges of electricity networks. This will include enhanced digitalization, data analytics and the resilience and flexibility of the network to manage new consumption models, including electric mobility and self-generation.

Collaborating in the project is the Provincial Council of Bizkaia, which will facilitate the relationship between the innovation ecosystem and the financial tools to accelerate startup participation.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Veolia koopt groot belang in nutsbedrijf Suez

Gepubliceerd op 6 oktober 2020 09:44 | Views: 26

PARIJS (AFN/RTR/BLOOMBERG) - Het Franse nutsbedrijf Veolia neemt voor 3,4 miljard euro een groot belang in zijn Franse branchegenoot Suez. Het belang van bijna 30 procent wordt gekocht van het Franse energieconcern Engie. Veolia wil nu een bod op heel Suez gaan uitbrengen.

De prijs voor het belang bedroeg 18 euro per aandeel Suez. Veolia wil een vergelijkbaar bod gaan doen op de rest van Suez. Overigens zit Suez helemaal niet te wachten op een overname door Veolia en noemt de toenadering "vijandig". Er zijn onder meer zorgen over banenverlies bij een eventuele overname. Veolia heeft gezegd enkel door te zetten met een volledige overname als het bestuur van Suez daarachter staat.

De Franse overheid is een grote aandeelhouder van Engie en stemde tegen een verkoop van het belang in Suez aan Veolia. De Franse staat wil graag dat beide bedrijven op vriendschappelijke manier met elkaar praten en hun meningsverschillen bijleggen voordat een overname plaatsvindt.

Veolia en Suez zijn actief met bijvoorbeeld waterzuivering en afvalverwerking. Door samen te gaan zou een wereldspeler ontstaan op dat gebied.
2.991 Posts, Pagina: « 1 2 3 4 5 6 ... 120 121 122 123 124 125 126 127 128 129 130 ... 146 147 148 149 150 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

AEX 860,42 -4,94 -0,57% 15:34
AMX 923,03 -3,57 -0,39% 15:34
ASCX 1.182,50 -7,33 -0,62% 15:19
BEL 20 3.823,22 -3,36 -0,09% 15:34
Germany40^ 17.741,90 -95,50 -0,54% 15:34
US30^ 37.800,53 -212,93 -0,56% 15:28
US500^ 5.004,70 -44,55 -0,88% 15:32
Nasd100^ 17.319,79 -229,01 -1,30% 15:32
Japan225^ 37.468,48 -533,23 -1,40% 15:32
WTI 82,15 +0,07 +0,09% 15:33
Brent 87,07 +0,08 +0,09% 15:34
EUR/USD 1,0673 +0,0030 +0,28% 15:34
BTC/USD 64.739,69 +1.151,92 +1,81% 15:31
Gold spot 2.384,13 +4,76 +0,20% 15:34
#/^ Index indications calculated real time, zie disclaimer
HOGE RENDEMENTEN OP DE IEX-MODELPORTEFEUILLES > WORD NU ABONNEE EN PROFITEER VAN MAAR LIEFST 67% KORTING!

Stijgers & Dalers

Stijgers Laatst +/- % tijd
Heineken 89,420 +1,420 +1,61% 15:16
DSM FIRMENICH AG 103,350 +0,600 +0,58% 15:14
UMG 26,940 +0,100 +0,37% 15:14
Dalers Laatst +/- % tijd
ADYEN NV 1.401,200 -41,400 -2,87% 15:16
ASMI 532,200 -12,600 -2,31% 15:16
BESI 135,400 -3,150 -2,27% 15:15

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront