Goud « Terug naar discussie overzicht

Sibanye Gold

3 Posts
JdeFL
1
Voor diegenen die deze afsplitsing van Gold Fields nog bezitten, sinds vandaag noteren ze onder een andere naam en andere tracker: de ADR (U.S.):SBSW, laatste koers 10.93$.

In order to effect an internal restructuring which creates a more efficient group structure, the group announces a firm intention in respect of an offer by Sibanye-Stillwater to acquire 100% of the issued ordinary share capital of Sibanye Gold Limited, by way of a scheme of arrangement and the listing of Sibanye-Stillwater shares on the Johannesburg Stock Exchange and American Depositary Shares on the New York Stock Exchange to replicate the listings of SGL.
The current corporate structure of Sibanye Gold Limited has the current South African gold assets at holding company level
With the growth of the Company the PGM acquisitions of Aquarius, Rustenburg Platinum, Stillwater and more recently Lonmin have been incorporated as subsidiaries of the holding company
To ensure structural flexibility and efficiency it is deemed appropriate to have the gold assets included as a subsidiary of the holding company
This effectively requires a new holding company to be listed with the same shareholders and exactly the same shares in the new holding company to be issued to existing shareholders. The new holding company will replicate the corporate governance structures and policies of Sibanye Gold Limited. This will be achieved through a proposed scheme of arrangement
The new holding company will be called Sibanye-Stillwater and the gold subsidiary will retain the name Sibanye Gold Limited
www.sibanyestillwater.com/news-invest...
DeZwarteRidder
0
Sibanye-Stillwater approves the development of the second phase of its Keliber lithium project
Johannesburg, 6 October 2023: Sibanye-Stillwater (JSE: SSW and NYSE: SBSW) is pleased to announce that it
has approved the commencement of the second phase of its Keliber lithium project which includes the
construction of the concentrator and the development of the Syväjärvi open pit mine in Päiväneva in
Finland. Delivery of ore from the Syväjärvi open pit mine will be timed to coincide with the commissioning of
the concentrator.
The environmental permit for phase two was received in December 2022, which enables the development
to continue. The appeal lodged by Sibanye-Stillwater, querying the terms of six of the 144 permitting
conditions (refer thevault.exchange/?get_group_doc=245/...
environmental-permit-rapasaari-and-paivaneva-concentrator-06feb2023.pdf) will continue in parallel with
the construction. Due to the nature of the appeal, the permission to commence construction has not been
withdrawn.
Higher capital expenditures have been planned to meet the more stringent effluent water quality
conditions. The capital expenditure for the concentrator is now forecasted at €230 million, which is €10
million higher than the previous estimate. This increase is due to the revision of the effluent water treatment
facility at the Keliber lithium refinery. We have incorporated amended technology into the flowsheet to
ensure compliance with environmental permits, which will also result in increased recoveries. Despite the
higher capital requirements, the adjustment has not had a negative impact on the net present value of the
project due to the positive impact of the expected recoveries. The updated aggregated project capital
for the Keliber project is estimated at €656 million (2023 real terms) including contingencies (previously €588
million in 2022 real terms).
The equity funding for the project has already been secured and completed, while the finalisation of the
debt funding is in progress.
More details on the capital and expected production profile will be shared by Sibanye-Stillwater at its
virtual battery metals investor day on Tuesday, 14 November 2023 with a live presentation shared via a
webcast (link: themediaframe.com/mediaframe/webcast.... and
conference call (register on:
services.choruscall.za.com/DiamondPas...
SecurityString=5ce1569ad) at 13h00 (CAT) / 11h00 (GMT) / 06h00 (EST) / 04h00 (MT).
Neal Froneman CEO of Sibanye-Stillwater said ”We are pleased to be commencing construction of the
lithium concentrator and Syväjärvi mine. The Keliber lithium project remains on track to be the first
integrated lithium hydroxide supplier in Europe. We look forward to working with all stakeholders to deliver
this exceptional project, which will contribute to the regional economy as well as to the growth of our unique
portfolio of green metals that aim to reverse climate change.”
3 Posts
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Detail

Vertraagd 18 apr 2024 20:04
Koers 2.383,29
Verschil +22,30 (+0,94%)
Hoog 2.392,82
Laag 2.361,43
Volume 0
Volume gemiddeld 0
Volume gisteren 0

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront