BAM Groep « Terug naar discussie overzicht

BAM februari 2021

2.515 Posts, Pagina: « 1 2 3 4 5 6 ... 113 114 115 116 117 118 119 120 121 122 123 124 125 126 » | Laatste
HenkdeV
0
quote:

Easymoneystonks schreef op 23 februari 2021 21:57:

Nee Powel heeft de rente omlaag gelult, morgen gewoon verder dalen.
En de beurzen omhoog.
Neutraal-1
0
quote:

HenkdeV schreef op 23 februari 2021 22:01:

[...]

En de beurzen omhoog.
Mooi dat geeft ons weer hoop.
€d_Modus Vivendi
1

Work begins on Salford Royal’s new £68m hospital
By
Nigel Barlow -
February 24, 2021 0

Salford Royal’s ambition to improve care for some of the sickest patients in Greater Manchester took a step closer with the start of building work at Salford Royal’s new £68million hospital.

Northern Care Alliance NHS Group Chief Executive Raj Jain and BAM Construction Manager Rob Baileywere joined by Dr Sheila Tose, Consultant Neuroanaesthetist, on the construction site to formally launch the building programme.

The facility, which will be called the James Potter Building, will support Salford Royal – part of the Northern Care Alliance NHS Group – in its role as the major trauma centre for Greater Manchester and the hub site for emergency General Surgery for the North West of Greater Manchester.
Salford Royal has appointed BAM to lead the construction of the new hospital – the scheme is also part of the Government’s Health Infrastructure Plan, the biggest hospital building programme in a generation which will deliver 48 hospitals across the country by 2030. The James Potter Building will welcome its first patients in the summer of 2023.

The facility is set to receive 90% of all major trauma patients in Greater Manchester, for example, people who have been involved in a serious road traffic accident or life-changing fall. It will also be the hub site for high risk emergency general surgery across Bolton, Salford and Wigan. This means that any high risk patients from these areas who require surgical or non-surgical intervention will be brought to Salford for their care.

Raj said: “We are delighted to be bringing these fantastic new facilities to our site for the benefit of patients across Greater Manchester. If you receive a major trauma injury and live in the Greater Manchester area or you live in Salford, Bolton and Wigan and require an emergency procedure for a serious abdominal injury or condition, then it’s likely you will be cared for at the James Potter Building.

“The facility will be purpose-built for the sickest patients – whom for many time is of the essence in relation to their care and treatment. Features include a resuscitation area, five emergency theatres, inpatient beds, and diagnostic imaging, and a helipad. The building has been designed by architects working alongside our clinicians to ensure every detail is captured, for example, extra large lifts to accommodate those patients that are being moved around the building on beds alongside numerous pieces of life-saving equipment and with a full team of clinicians accompanying them.”

Dr Tose, who is also Clinical Lead for Major Trauma, said “As one of the clinicians who will have the privilege of working in this building and treating patients here, I am really excited to see building work start. Whilst the building will be impressive in appearance, it’s important to say that what will be inside the building is just as amazing. This building will be home to the UK’s first hybrid trauma theatre for patients who have multiple serious injuries. This means that in one place, clinicians will be able to work on and treat someone who has, for example, internal bleeding and also requires surgery for a head injury. Previously they would have to be addressed separately.”

Rob Bailey, BAM’s Construction Manager, said: “Our team are buzzing with the excitement of creating these new facilities right in the heart of our own city. It is always special when you get the chance to shape the places you live in, work in, learn in and recover in. There’s no more special or important place than a hospital and we’re so pleased to be working with our friends in the NHS who are savings lives each day in such extraordinary circumstances. Every day we are helping them is a good one.”

Minister for Health Edward Argar said: “We are backing the NHS to build back better and throughout the pandemic we have continued to plan and invest in the future of our NHS buildings. I’m pleased work is now getting underway on this major development to provide state of the art new facilities and ensure patients can access specialised, life-saving treatment.
“The £68 million new hospital at Salford Royal will be one of the 48 hospitals which we’re backing to deliver by 2030 as part of the biggest hospital building programme in a generation and strategic long-term investment in the future of our NHS.”
Tartessos
0
Het begint goed .
Op dit moment (8:07 uur) noteert de Euronext theoretische opening 2,17 euro. Kan nog verder oplopen.
Succes vandaag.
Kbg
1
Goedemorgen,
We moeten even weer de gang te pakken krijgen lijkt het.
Of ze wachten op een flinke dumpert zodat ze weer mooi goedkoop verder kunnen
innicksname
1
quote:

Sarlat schreef op 24 februari 2021 09:45:

Goedemorgen,
We moeten even weer de gang te pakken krijgen lijkt het.

Zeker. Is jou dat gisteren nog gelukt op die elektrische step?
Kbg
1
quote:

innicksname schreef op 24 februari 2021 09:46:

[...]
Zeker. Is jou dat gisteren nog gelukt op die elektrische step?
Daar was na 3 uur ook de gang uit.
Toen we begonnen reed hij 25 km pu toen we stopten was het nog maar 19 km pu ':)
innicksname
1
quote:

Sarlat schreef op 24 februari 2021 09:48:

[...]

Daar was na 3 uur ook de gang uit.
Toen we begonnen reed hij 25 km pu toen we stopten was het nog maar 19 km pu ':)
Dat was vast een teken :-)
Ben je er toch lekker drie uur uit geweest.
Kbg
1
quote:

innicksname schreef op 24 februari 2021 09:53:

[...]
Dat was vast een teken :-)
Ben je er toch lekker drie uur uit geweest!
Jaa zo is dat.
Ben een hele dag van huis geweest, was toch nog een dikke 2 uur rijden vanuit N-H
Marinus-86
1
quote:

Sarlat schreef op 24 februari 2021 09:48:

[...]

Daar was na 3 uur ook de gang uit.
Toen we begonnen reed hij 25 km pu toen we stopten was het nog maar 19 km pu ':)
Behoorlijke remweg dus !!
Kbg
1
Marinus-86
1
quote:

Sarlat schreef op 24 februari 2021 10:00:

Jaa. Het mooiste onder weg was dat ik een prachtig bouwwerk van BAM zag
Kijk dat was de moeite waard om even te stoppen.
innicksname
0
quote:

Sarlat schreef op 24 februari 2021 10:00:

Jaa. Het mooiste onder weg was dat ik een prachtig bouwwerk van BAM zag
Ah, je bent helemaal naar Venlo gegaan. Met de step over de loopbrug gereden?
Kbg
1
quote:

innicksname schreef op 24 februari 2021 10:03:

[...]
Ah, je bent helemaal naar Venlo gereden. Met de step over de loopbrug gereden?
Jaa we hebben een beste ronde gemaakt.
We reden in het bos.
En ik zag dat grote hoge ding staan. Ik dacht dat het een sluis was ofzo, dus zou tegen m'n vrouwtje kom we gaan ff kijken. Toen zag ik dat het een gebouw was gefabriceerd door BAM. Vanaf daar zijn we zo over gestoken over de snel weg en terug gereden via de pond naar argen
innicksname
0
quote:

Sarlat schreef op 24 februari 2021 10:10:

[...]
Jaa we hebben een beste ronde gemaakt.
We reden in het bos.
En ik zag dat grote hoge ding staan. Ik dacht dat het een sluis was ofzo, dus zou tegen m'n vrouwtje kom we gaan ff kijken. Toen zag ik dat het een gebouw was gefabriceerd door BAM. Vanaf daar zijn we zo over gestoken over de snel weg en terug gereden via de pond naar argen
Een Floriade souvenir. Wel lekker herkenbaar.
Je bent anderhalve maand te vroeg gegaan, anders had je op de terugweg asperges kunnen oppikken.
€d_Modus Vivendi
0
Folkestone & Hythe District Council has appointed BAM Construction to build a new leisure centre and promenade in Hythe.

Main construction will not begin on site until the first quarter of 2022 but preparatory work and site investigations start next month.

BAM is initially operating on a pre-construction services agreement until the full design of the scheme is finalised.

The same core team from BAM who worked on the Dover Leisure Centre will be working on the Hythe development.

It is a controversial project in the area, however, which has been subject to legal challenegs from opponents. The leisure centre, along with a hotel, shops and 150 new homes, are being built on green land off Princes Parade in the town. BAM's contract is just for the leisure centre and enabling infrastructure.
Related Information

Cllr David Monk, leader of Folkestone & Hythe District Council, said: “We’ve long held ambitions to replace our popular but old and tired swimming pool in Hythe… Back in 2012 Princes Parade – a former municipal waste tip – was identified as the preferred location for this development. There have been years of careful deliberation, public consultation and painstaking preparation involved in this project. We think the residents of Hythe and the wider district deserve a new swimming pool and leisure facilities fit for the 21st century.”

BAM’s construction manager, Daniel Brenchley, said: “We have exactly the right experience having delivered leisure facilities in coastal positions around the country and with our civil engineering heritage especially in a marine environment.”

BAM got the job via the Southern Construction Framework (SCF). It has signed an initial £2.4m contract. Final contract value, pending further design work, is expected to be around £23m.
€d_Modus Vivendi
0

BAM’s landslip repairs help get passengers moving again in the South East
24 February 2021- BAM Nuttall Ltd

Camberley, 24 February 2021 - BAM Nuttall’s rail and ground engineering teams helped Network Rail to get trains moving in the South East this weekend after completing emergency repairs to three major landslips near Tunbridge Wells.

The landslips, in the High Brooms area, were discovered on 1 February by sensors installed by Network Rail after two previous slips along the 150 m stretch of track. BAM ‘s Southern Multi-disciplinary Framework (SMD) team was immediately called into action, quickly assessed the damage and formulated a plan to repair and secure the slip.

The large-scale stabilisation works included removal of 5,000 tonnes of material and instalment of 3,215 m2 of rock fall netting. Due to the complex nature of the local clay-based ground conditions, the team used a ‘spider excavator’ to reduce the need for rope access.

The team also took the opportunity to carry out some planned works further down the track during the possession. The final stages of the regrade included installation of 1,000 soil nails and ground anchors. All of the work, including installation of an additional 24 anchors, was completed without any accidents and incident.

Huw Jones, BAM Nuttall’s Divisional Director, Rail said: ‘This work demonstrates the ingenuity, responsiveness and broad-based skillset of our team. The nature of the soil conditions in this location meant that our ground engineering expertise was invaluable. Despite the current lockdown, a normal rail services in the South East is vital to the regional economy. Working hand-in-hand with our rail supply chain partners, we were able to get the line open again less than three weeks after the slip was detected. I’d like to thank the whole team for its dedication and commitment to excellence over this period.’

Fiona Taylor, Network Rail Route Director for Kent, said: ‘I’m really grateful to passengers and our lineside neighbours for their patience during these works. It is absolutely essential that our railway is safe to travel on and the work we’ve done will help to improve the resilience of this line for years to come. By working smartly, we have been able to accelerate some of the repairs needed on a nearby site at Wadhurst Tunnel. I am pleased that we were able to fully reopen the London to Hastings line on Saturday.’
€d_Modus Vivendi
0
Verbouwing Stadhuis klaar
24 februari 2021 - BAM Bouw en Techniek bv
Verbouwing Stadhuis klaar

(Persbericht gemeente Tilburg:) Tilburg, 22 februari 2021 - De verbouwing van het Stadhuis aan het Stadhuisplein is klaar. Vanaf maandag 22 februari neemt de gemeente het gebouw beperkt in gebruik, binnen de coronarichtlijnen.

Het vernieuwde Stadhuis is een uitnodigende plek waar Tilburgers, ondernemers, partners en de gemeente elkaar kunnen ontmoeten en samenwerken. Het is ook de werkplek van het college, de raad en een groot deel van de medewerkers van de gemeente. In december 2018 is de verbouwing gestart. De bouw werd uitgevoerd door BAM Bouw en Techniek. Het ontwerp is van DEDRIE architecten en het interieurontwerp van Common Affairs. Diverse monumentale elementen van het oorspronkelijke gebouw zijn bewaard gebleven. Dat gebouw stamde uit 1972, en is indertijd ontworpen door Kraaijvanger Architects.
Indeling Stadhuis

Opvallend in het Stadhuis zijn de uitnodigende ingang en het grote raam van 40 x 5 meter in de raadszaal, dat uitzicht geeft op de stad. De begane grond en eerste verdieping zijn voor publiek toegankelijk. Tilburgers, ondernemers en partners kunnen hier terecht voor afspraken met medewerkers van de gemeente. Bijvoorbeeld in het werkcafé of vergadercentrum. De overige verdiepingen bestaan uit werkplekken voor medewerkers. Vanwege de coronamaatregelen werken de meeste ambtenaren thuis. Dat blijft zo voor de tijd dat de Corona-maatregelen gelden, ook wanneer het Stadhuis in gebruik is genomen.
Duurzaam

De gemeente heeft met talloze maatregelen geïnvesteerd in een duurzaam kantoor. Bijvoorbeeld door vernieuwing en thermische isolatie van de gevels, daken en vloeren. Het kantoor wordt verwarmd en gekoeld met warmte- en koudeopslag in combinatie met warmtepompen en zonnepanelen. Wethouder Oscar Dusschooten: ‘Daardoor is dit Stadhuis het meest duurzame overheidsgebouw van Nederland.’
Stadswinkel

De volgende fase in het project is de verbouwing van Stadskantoor 2 en de voormalige bibliotheek aan het Koningsplein. Deze start half maart. Het gebouw krijgt na oplevering de naam Stadswinkel. De verbouwing duurt ruim 1,5 jaar. Daarna volgt de inrichting en verhuizing. De verwachting is dat de Stadswinkel in het najaar van 2023 in gebruik wordt genomen.
2.515 Posts, Pagina: « 1 2 3 4 5 6 ... 113 114 115 116 117 118 119 120 121 122 123 124 125 126 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Detail

Vertraagd 3 mei 2024 17:35
Koers 3,390
Verschil -0,028 (-0,82%)
Hoog 3,464
Laag 3,326
Volume 2.640.209
Volume gemiddeld 0
Volume gisteren 5.737.912

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront