Energie « Terug naar discussie overzicht

Kernenergie

847 Posts, Pagina: « 1 2 3 4 5 6 ... 23 24 25 26 27 28 29 30 31 32 33 ... 39 40 41 42 43 » | Laatste
voda
0
Floating NPP Delivered 10 million kWh of Electric Power to Chukotka Grid

The floating nuclear heat and power plant FNHPP, a project by the Rosenergoatom Joint-Stock Company, a part of ROSATOM, has delivered its first 10 mln kWh of electric power into the isolated network of the Chauny-Bilibino hub (the Chukotka Autonomous Region) since its connection to the grid on December 19, 2019.

As of now, the FNHPP caters for 20% of the Chauny-Bilibino hub’s needs, and in the meantime it is intended to fully cover the growing demand for electric power in Chukotka by becoming a reliable source of energy for both the city of Pevek and the whole region in general.

Source : Strategic Research Institute
Bijlage:
voda
0
Ministers See Nuclear Progress at Hinkley Point C

Ministers from the Department for Business, Energy & Industrial Strategy visited Hinkley Point C to see progress at the new nuclear power station. The ministers heard about the UK supply chain and the progress on the two reactors. Unit One is now being built above ground and the project’s next major milestone is completion of the base for Unit Two in June later this year.

The ministers also visited Hinkley Point B power station which last week hit a new record for low carbon electricity production in the UK, passing 300TWH, enough to continuously power every home in the UK for three years, avoiding 105 million tonnes of CO2 emissions.

They saw the National College for Nuclear in nearby Cannington, one of the many initiatives to increase UK skills. These include the opening of a national welding centre at Bridgwater College, due in the first half of 2020.

Hinkley Point C will supply the UK with reliable low carbon electricity for decades to come and will be an essential part of a future energy mix without polluting fossil fuels.

Source : Strategic Research Institute
voda
0
First Serial Batch of MOX Fuel Loaded into BN-800 Fast Reactor at Beloyarsk NPP

BN-800, the world’s most powerful operational fast neutron reactor at Unit 4 of Beloyarsk NPP in Russia, has been loaded with the first serial batch of MOX fuel made of depleted uranium and plutonium oxides. After an overhaul, the power unit has successfully resumed operation. Distinct from traditional nuclear fuel with enriched uranium, MOX fuel pellets are based on the mix of nuclear fuel cycle derivatives, such as oxide of plutonium bred in commercial reactors, and oxide of depleted uranium which is derived by defluorination of depleted uranium hexafluoride (UF6), the so-called secondary tailings of uranium enrichment facilities.

The power plant engineers have loaded eighteen MOX fuel assemblies at the BN-800 reactor core, while in 2020, Rosenergoatom and TVEL (i.e. power generation and nuclear fuel divisions of ROSATOM) are planning to load another batch of 180 fuel assemblies. By the end of 2021, ROSATOM is committed to replace all remaining uranium-based fuel assemblies in the core with MOX fuel. Thus, for the first time in Russian history, a fast neutron reactor would start operations with a full load of MOX fuel only.

The BN-800 reactor was initially launched with a hybrid core containing both uranium and MOX fuels. But as the uranium BN-800 fuel assemblies were produced by Elemash, TVEL’s major fabrication facility in Elekrostal, Moscow region, the MOX fuel assemblies were experimental ones, assembled at the Research Institute of Atomic Reactors in Dimitrovgrad, Ulyanovsk Region.

Source : Strategic Research Institute
voda
0
Kansen voor kernenergie: de minikerncentrale

De Britse autofabrikant Rolls-Royce werkt aan minikerncentrales. Snel te plaatsen, CO2-arm en stukken goedkoper om te bouwen. Hoe werkt dat?

Artist’s impression van een minikernreactor van Rolls-Royce. Het bedrijf is van plan in een fabriek gebouwde installaties te exploiteren die op prijs kunnen concurreren met goedkope duurzame energiebronnen zoals offshore-windenergie.

Wanneer gaan ze draaien?

Al in 2029, beloofde de Britse autofabrikant eind januari bij de BBC. Het bedrijf wil minikernreactoren gaan maken die min of meer van de fabrieksband rollen. Hun ontwerp heeft 440 megawatt vermogen, iets minder dan de (relatief kleine) Nederlandse kerncentrale in Borssele. Met een oppervlak van nog geen hectare zijn ze een stuk kleiner dan bestaande of geplande centrales, die wel 1500 of soms zelfs 3200 MW vermogen hebben.

En met een geschatte prijs van €2 mrd zijn ze ook goedkoper. De eerste reactoren moeten gebouwd worden in Wales of het noordwestelijke Cumbria, en uiteindelijk zullen er tien tot vijftien in het VK komen, stelt het bedrijf. Er is concurrentie, want de Amerikaanse start-up Nuscale werkt aan vergelijkbare reactor, zoals FD-redacteur Bert van Dijk onlangs beschreef in een opiniestuk over kernenergie.

Wat maakt de centrales goedkoper?

De efficiëntere bouw. Nu zijn kerncentrales bijna altijd unieke en extreem dure bouwwerken. Ze kosten meer dan €10 mrd per centrale. Dat moet verbeteren door ze in een fabrieksomgeving te bouwen. De delen kunnen dan per vrachtwagen naar de locatie worden vervoerd. Zet drie of vier van deze kleine prefabreactoren naast elkaar, en je hebt evenveel vermogen als de grote, duurdere kerncentrale. 'Economy of number, in plaats van economy of scale', zegt Jan Leen Kloosterman, hoogleraar nucleaire energie aan de TU Delft.

Hij ziet kansen door de prijs en de flexibiliteit. Zo kunnen energiebedrijven eerst een enkele reactor plaatsen en meteen geld verdienen, en er later nog een reactor bij zetten als het nodig is. 'Nu moet je acht jaar tot tien jaar betalen aan de bouw voordat er eindelijk inkomsten komen, dat is wel een rem.'

Is dit net zo veilig?

In principe wel. Bij kernsplijting ontstaan radionucliden met gevaarlijke straling. Hoe meer energie een centrale opwekt, hoe meer splijtstof en nucliden er potentieel kunnen ontsnappen. Maar of de kernsplijting nu in één grote reactor gebeurt of in vijf kleinere naast elkaar, maakt volgens Kloosterman niet uit.

Wel scheelt het welk type reactor en welk veiligheidssysteem er worden gebruikt. De minireactoren zouden van hetzelfde type zijn als de centrale in Borssele. En ze kunnen zo gebouwd worden dat een ongeval als dat in Fukushima minder snel kan gebeuren.

Het probleem bij kernenergie is dat de splijtstof in de reactoren altijd warmte afgeeft,

zelfs als de centrale uit staat

Hoe voorkom je een Fukushima?

Door handige koeling. Het probleem bij kernenergie is dat de splijtstof in de reactoren altijd warmte afgeeft, zelfs als de centrale uit staat. Zonder koeling kan splijtstof naar buiten smelten en heb je een kernongeval. Dus koeling moet altijd werken, ook als een tsunami alle veiligheidssystemen heeft lamgelegd.

Technisch is dat mogelijk. Omdat warm water uitzet, kun je een systeem ontwerpen waarbij koelwater bij hitte automatisch gaat stromen, en zo langs de splijtstof vloeit. Dat lost niet alle gevaren op, maar vermindert wel het risico. In Japan ontbrak dit systeem, maar de uitgeschakelde kerncentrale in Dodewaard bijvoorbeeld had het wel.

Hoe nieuw is dit idee van seriereactoren?

Redelijk nieuw. Frankrijk werkte al min of meer in serie toen het land besloot in korte tijd veel dezelfde reactoren te bouwen. Al ging dat niet op de manier die de bouwers nu voor ogen hebben. Dat het initiatief nu ontstaat, komt omdat bedrijven een nieuwe kans zien voor kernenergie.

Centrales kunnen veel stroom leveren, nagenoeg zonder uitstoot van CO2. De kostprijs is in het Britse geval zo'n zes cent per kilowattuur, concurrerend met andere productiemethoden. Afval blijft een punt, maar dat hopen we goed te kunnen opbergen. De reactortechniek zelf is ook al redelijk bekend. Dus eigenlijk is er maar één ding echt nieuw aan de SMR (small modular reactor): ze bouwen aan de lopende band.

fd.nl/futures/1333897/kansen-voor-ker...
Bijlage:
voda
0
Voor een CO2-vrije toekomst is kernenergie nodig

Het is een illusie dat we de klimaatdoelen zullen halen met wind en zon, betoogt FD-redacteur Bert van Dijk. Kerncentrales zijn een noodzakelijk onderdeel van de oplossing.

Het afgelopen decennium was volgens de Nasa de warmste tienjaarsperiode die ooit is gemeten. De opwarming van de aarde door de invloed van de mens is onbetwist en wordt wereldwijd steeds zichtbaarder. Bijna alle landen hebben daarom in het Parijsakkoord van 2015 afgesproken maatregelen te zullen nemen om de uitstoot van CO2 drastisch te reduceren en zo de opwarming van de aarde te beperken tot maximaal 2 graden, maar liever nog tot 1,5 graad.

De mooie woorden, beloftes en intenties van alle landen ten spijt, neemt de CO2-uitstoot in de wereld echter niet af, maar nog steeds toe. En het aandeel hernieuwbare energie groeit ondanks miljarden euro's aan investeringen en subsidies slechts mondjesmaat en bij lange na niet hard genoeg om de klimaatdoelstellingen voor 2030 en 2050 te halen.

Nederland hekkensluiter

Dat geldt ook voor Nederland. In 2013, toen het Energieakkoord werd gesloten, was 4,72% van alle energie in Nederland hernieuwbaar; dat wil zeggen geproduceerd met wind, zon en vooral biomassa-energie. Afgelopen jaar lag dat percentage op 8,6%. In zes jaar tijd is het aandeel dus met slecht 3,9 procentpunt gestegen. En dat is vooral dankzij het omstreden verbranden van hout.

Wind en zon waren samen afgelopen jaar goed voor een magere 3% van alle opgewekte energie in Nederland. Ons land is daarmee hekkensluiter in de Europese Unie. Alle andere lidstaten doen het beter. Bij het terugdringen van de CO2-uitstoot is Nederland zelfs door de hoogste rechter op de vingers getikt, omdat de voortgang achterblijft bij wat het kabinet zelf steeds belooft en Nederland zijn zorgplicht naar haar burgers verzaakt.

Alarmbellen

Ook wereldwijd gaat het niet goed. De installatie van nieuwe windmolens en zonneparken houdt de groei van de totale energievraag simpelweg niet bij, laat staan dat hernieuwbare energie erin slaagt het wereldwijde energiesysteem minder fossiel te maken. Het feit dat fossiele brandstoffen nu nog steeds ongeveer 80% van de wereldwijde energiemix uitmaken, net als dertig jaar geleden en ondanks tientallen miljarden investeringen in duurzame energiebronnen, laat zien hoe moeilijk het is de wereld van zijn fossiele verslaving te bevrijden.

Ondertussen trekken politici, activisten, wetenschappers, economen en experts steeds luider aan de alarmbel. ‘Regeringen moeten actie ondernemen en wel nu. Er is geen tijd te verliezen’, zei secretaris-generaal António Guterres van de Verenigde Naties tijdens de laatste klimaattop in Madrid.

Klimaatwetenschappers luiden inmiddels zo’n beetje alle noodklokken die er zijn: de ijskappen smelten, permafrost ontdooit, oceanen raken verzuurd, de temperatuur loopt op. De Britse krant The Guardian heeft het niet meer over klimaatverandering, maar heeft het woord in al zijn berichtgeving officieel vervangen door klimaatcrisis of klimaatnoodgeval.

En hoewel het beleid in de afgelopen jaren niet bepaald tot vertrouwen voor de toekomst leidt, gaan landen onverdroten voort op dezelfde weg. De Europese Commissie kondigde bij monde van vicevoorzitter Frans Timmermans onlangs aan in 2050 het eerste klimaatneutrale continent te willen zijn. De EU wil de komende tien jaar €1000 mrd aan publiek en privaat geld vrijmaken voor investeringen in projecten die klimaatverandering moeten tegengaan.

36.000.000

Het sluiten van kerncentrales in Duitsland heeft geleid tot 36 miljoen ton extra CO2-uitstoot per jaar.

Kernenergie

De enige technologie die nu al een substantiële CO2-vrije bijdrage levert, kernenergie, is echter uitgesloten van deze zogenoemde 'green deal'. Kerncentrales zijn goed voor ongeveer een kwart van alle elektriciteit in de EU en daarmee verreweg de grootste CO2-vrije energiebron die de EU heeft.

Een aantal landen - Duitsland voorop - wil zelfs bestaande kerncentrales sluiten. Het ontmantelen van deze schone energiebron in een tijd waarin elke gram extra CO2 in de atmosfeer moet worden vermeden, is onverantwoord. De ene CO2-vrije energiebron deels vervangen door een andere, zal het uitfaseren van fossiele CO2-uitstotende centrales alleen maar vertragen.

De Duitse bondskanselier Angela Merkel die in een gloedvol betoog zegt dat ze 'alles moet doen wat menselijk mogelijk is' om de grote uitdaging van de mensheid - klimaatverandering - aan te kunnen en vervolgens een nieuwe CO2-uitstotende kolencentrale opent en CO2-vrije kerncentrales gaat sluiten, is niet alleen ongeloofwaardig. Ze deelt ook een brutale klap uit in het gezicht van iedere burger die oprecht bezorgd is over de opwarming van de aarde.

Ja, het is waar dat de CO2-uitstoot in Duitsland door het groeiende aandeel wind- en zonne-energie afneemt, maar om de gewenste 80%-95%-reductie in 2050 te realiseren, zal het tempo van de reductie fors omhoog moeten. Het sluiten van CO2-vrije elektriciteitscentrales bereikt precies het tegenovergestelde.

Frans Timmermans

'Ik heb ideologisch niets voor én niets tegen kernenergie', zei vicevoorzitter Frans Timmermans van de Europese Commissie onlangs in het NRC. Maar volgens hem is kernenergie 'hartstikke duur' en is er dus geen businesscase.

Dat er nu geen businesscase voor kernenergie is, klopt. Die zal er ook nooit komen, zolang andere vormen van energie met subsidie de energiemarkt verstoren. Wind- en zonnestroom krijgen voorrang op het elektriciteitsnet.

Dat betekent dat kolen-, gas- en kerncentrales alleen aanvullend zijn en niet zoals vroeger 24 uur per dag staan te draaien. Weggeconcurreerd door verplichte voorrang voor wind- en zonne-energie, verliezen deze centrales in de toekomst automatisch hun verdienmodel. Ze draaien dan simpelweg te weinig uren om de kosten terug te verdienen.

Er is geen investeerder die in zo'n markt een nieuwe centrale gaat bouwen. Zeker niet als daar niet iets van een langetermijnzekerheid of garantie van de overheid tegenover staat. Tegelijkertijd is de realiteit dat dergelijke centrales altijd noodzakelijk zullen blijven om stroom te leveren als het niet waait of de zon niet schijnt.

Tsjernobyl en Fukushima

Natuurlijk heeft kernenergie risico's, maar zelfs 'Tsjernobyl' en 'Fukushima' hebben - in tegenstelling tot wat veel mensen denken - geleid tot een een relatief beperkt aantal dodelijke slachtoffers. Zet deze menselijke drama's af tegen de miljoenen mensen die elk jaar overlijden door luchtvervuiling als gevolg van fossiele centrales, en het is duidelijk dat het sluiten van kerncentrales levens kost en voor meer luchtvervuiling zorgt.

Recent onderzoek van de toonaangevende Amerikaanse economische denktank National Bureau of Economic Research maakte dat onlangs heel concreet inzichtelijk: het sluiten van kerncentrales in Duitsland heeft geleid tot 36 miljoen ton extra CO2-uitstoot per jaar. Het sluiten van de centrales is vooral opgevangen door kolencentrales, zo concluderen de onderzoekers, en dat heeft ervoor gezorgd dat er 1100 mensen per jaar meer overlijden aan de gevolgen van de fijnstofuitstoot.

Veilige energiebron

Als het gaat om klimaatverandering, luisteren verstandige beleidsmakers terecht naar wetenschappers die ons waarschuwen voor de gevolgen van door de mens veroorzaakte klimaatverandering. Maar als diezelfde wetenschappelijke wereld aantoont dat kernenergie de veiligste energiebron is, zoals onder andere het toonaangevende The Lancet deed, waarom luisteren we dan niet?

voda
0
Deel 2:

Wie wel eens bij Covra in Zeeland op bezoek is geweest, waar al het hoog- en laagradioactieve afval van Nederland wordt opgeslagen, ziet hoe goed, veilig en zorgvuldig Nederland omgaat met kernafval. Dat kernafval over honderd jaar uiteindelijk definitief zal moeten worden opgeborgen in een eindberging, is technologisch geen probleem. In Duitsland stopt Europa al jarenlang giftige stoffen als arseen en kwik voor altijd onder de grond, omdat het te gevaarlijk is voor de volksgezondheid. Wat is er wezenlijk anders aan om dat in de toekomst ook met kernafval te doen?

Geef kernenergie een serieuze rol in het Nederlandse, maar bij voorkeur Europese energiebeleid. Staar niet blind op kostendalingen van een specifieke energiebron, maar kijk naar de totale kosten van het bouwen van een CO2-vrij energiesysteem. Zoals de rapporten van het klimaatpanel van de VN en het Internationaal Energieagentschap steeds weer laten zien: zonder kernenergie wordt het heel moeilijk om langetermijnklimaatdoelen te halen.

De enige technologie die een substantiële bijdrage aan CO2-reductie levert,

is de uitgesloten van de 'green deal'

Hernieuwbare energie is duur

Want ook hernieuwbare energie is niet gratis. De kosten van wind- en zonne-energie zijn de afgelopen jaren weliswaar spectaculair gedaald, toch heeft zich dat niet vertaald in lagere energiekosten voor bedrijven en consumenten. Sterker nog: de stroomprijs in duurzame gidslanden Duitsland en Denemarken met relatief hoge penetratie wind- en zonne-energie, ligt op het hoogste niveau in de EU. In Frankrijk, waar kernenergie goed is voor bijna 75% van de elektriciteit, betalen huishoudens juist 43% minder voor een kilowattuur dan huishoudens in Duitsland.

Belangrijke reden is dat het optuigen en laten draaien van een decentraal energiesysteem met heel veel verschillende gefragmenteerde kleinere energiebronnen in plaats van een handjevol grote energiecentrales, heel veel geld kost in de vorm van nieuwe stroomkabels, opslagtechnologieën en back-upcentrales voor periodes zonder wind en zon.

CO2 als hoofddoel

Nederland, of beter nog de EU, zou er daarom goed aan doen een meer systematische benadering te kiezen om iets te doen aan de opwarming van de aarde. Dat betekent dat het reduceren van CO2 het hoofddoel zou moeten zijn, niet per definitie het verhogen van het aandeel hernieuwbare energie.

In Nederland is elke regio nu bezig zijn eigen duurzame energiestrategie uit te dokteren, hetgeen onvermijdelijk zal leiden tot inefficiëntie en gezien de voorkeur voor wind- en zonne-energie een hele grote impact op het landschap en de ruimtelijke ontwikkeling. Het zou beter zijn om een kostenefficiënt, schoon en betrouwbaar landelijk energiesysteem te ontwerpen met kernenergie als belangrijkste pilaar en minimale impact op het landschap en de natuur. Het is niet te laat. Ook na 2030 en 2050 heeft Nederland en Europa CO2-vrije stroom en warmte nodig.

Grote kostenoverschrijdingen met vele miljarden bij nieuwe kerncentrales zoals Hinkley Point C en het Finse Olkiluoto trekken veel media-aandacht, maar die extra kosten vallen nog steeds nagenoeg weg in de 60 jaar dat deze centrales minimaal zullen draaien.

Kerncentrales kunnen bovendien een nuttige rol spelen in het maken van groene waterstof om daarmee de industrie te vergroenen. Dat zou ook met windmolens of zonnepanelen kunnen, maar dat is gezien het inherent wisselende karakter van wind en zon, niet het meest efficiënt.

Thoriumcentrales

Ten slotte is er nóg een reden om kernenergie en de grote nucleaire kennissector in Nederland niet nu al af te schrijven. Lokaal en wereldwijd vindt er namelijk veel innovatie plaats op het gebied van kernenergie. Op de hele lange termijn - enkele decennia - kunnen zogenoemde thoriumcentrales bestaande centrales misschien aanvullen of vervangen. Daarmee worden centrales nog veiliger en het afval-'probleem' kleiner.

Maar dichter bij het heden zijn er ook bemoedigende ontwikkelingen. Zo heeft De Amerikaanse start-up Nuscale minireactoren in ontwikkeling die goedkoper dan grote centrales, in een fabriek kunnen worden gebouwd, veilig zijn, flexibel en CO2-vrij. Het Britse Rolls-Royce kondigde in januari aan dat het van plan is om al in 2029 minikerncentrales te installeren en in bedrijf te hebben. Rusland ontwikkelt ondertussen een hele nieuwe generatie veiligere centrales die eigen afval als grondstof hebben.

Kernenergie is dus allerminst ten dode opgeschreven, maar verdient juist in alle opzichten een serieuze plek in een toekomstig modern CO2-vrij energiesysteem. Het is aan politici om de randvoorwaarden daarvoor te scheppen en ontwikkeling ervan te stimuleren. Wie kernenergie nu uitsluit, heeft later echt wat uit te leggen.

fd.nl/futures/1329562/voor-een-co2-vr...
voda
0
GE Hitachi Starts Licensing Process for New Small Modular Nuclear Reactor Design

GE Hitachi Nuclear Energy has announced it is beginning the licensing process with the Nuclear Regulatory Commission for its small modular nuclear reactor design. The proposed design, the BWRX-300, is based on a design already licensed by the NRC in 2014, and the company hopes to leverage this existing work to make a cheaper SMR that can become cost-competitive with power generation from combined cycle gas plants and renewable energy platforms

SMRs have attracted industry interest as a potential way to make new nuclear power plants economically viable after multi-billion dollar cost overruns at conventional nuclear plant projects in Georgia and South Carolina. But after over a decade of interactions with the NRC, no SMR design has yet received a license.

Source : Strategic Research Institute
voda
0
First Tier of Reactor Building Outer Containment at Kursk NPP-2 Completed

The first of 10 key milestones related to the Kursk NPP-2 construction has been performed ahead of schedule in the current year - the installation of the first tier of the reactor building outer containment was completed at power unit No 1. First Deputy Director for the Construction of New Power Units Nikolai Mitrofanov said “Work for Kursk NPP-2 power unit construction are underway according to the schedule and even ahead of schedule. The construction of the containment was carried out in stages. 15 armored units were installed, which closed in a circle of 50.8 meter diameter”.

The outer containment is one of the important power unit localizing safety systems. It is intended both for taking of loads from operational impacts, such as ionizing and thermal radiation, as well as external extreme climatic influences, i.e. hurricanes, tornadoes, seismic impacts of the SSE level (safe shutdown event), as well as the effects of a shock wave and a plane crash. The height of the protective shell is 65.4 meters, the shell thickness ranges from 0.5 to 1.5 meters. The design provides for a five-tier structure, its installation is to be finished in in 2023. The the first tier of the outer containment was installed at the level of -0.050 meters and the structure was finally built up to the level of +8.950 meters. Installation of additional fittings is currently underway, the next stage will be concreting of the second section of the outer containment first tier (while the first one has been already concreted) and the adjacent structures. The next tier is scheduled to be installed in the end of May.

Source : Strategic Research Institute
voda
0
Rosatom’s FNPP Akademik Lomonosov Supplied 21 Million kWh Electricity

Rosatom’s Floating Nuclear Power Plant Akademik Lomonosov, currently in trial operation in the town of Pevek in Russia’s Chukotka Region, has supplied more than 21 million kWh of electricity to the isolated network of the Chaun-Bilibino energy system (one of three autonomous energy grids in Chukotka) as of February 26, 2020.

Akademik Lomonosov is expected to be commissioned for commercial operation in summer 2020 after additional tests and the issuance of a permit by Russia’s nuclear energy watchdog Rostekhnadzor. After this, the FNPP will supply the town of Pevek with thermal energy. The first subdistrict of the town will be connected to heat supply starting from summer 2020; the rest of the town will be connected by 2021.

Source : Strategic Research Institute
Bijlage:
voda
0
ROSATOM TVEL and Spanish Partners Develop Cooperation in Decommissioning & Dismantling of Nuclear Facilities

TVEL Fuel Company of ROSATOM and Spanish companies ENUSA, ENSA and IDOM have signed the MOU on development of cooperation in Decommissioning & Dismantling of nuclear facilities, as well as in the area of nuclear waste management and related engineering and consulting services. Along with that the companies have signed the roadmap for various projects development in the short run. The parties agreed to cooperate in different formats in order to offer services the global market.

TVEL Director for Global Development Dmitry Bazhenov said “Nuclear facilities decommissioning and dismantling, radioactive waste and spent fuel management along with solving relevant issues of radiation safety represent a challenging task both from the environmental point of view, that is fully in line with the UN Sustainable Development Goals, and in terms of the growing decommissioning market that, as per current forecasts, may exceed EUR 100 billion by 2030. Enterprises of TVEL Fuel Company have already gained a vast expertise in accomplishing such complex high tech projects. By means of comprising these expertise and positive references in one integrating entity, we are able to act as a universal subcontractor. Creation of alliances with our partners abroad would enable us not only to enhance our competences, but also to work in the foreign markets in a more efficient manner.”

Source : Strategic Research Institute
Bijlage:
voda
0
Atommash First Set of Steam Generator Vessels for Unit 1 of Rooppur NPP in Bangladesh

ROSATOM’s engineering division Atomenergomash’s Volgodonsk Branch of AEM-technology’s Atommash (performed the fit up and welding of set of steam generators for Unit 1 of Rooppur NPP in Bangladesh. Steam Generator is a heat exchanger, it is part of a reactor plant and belongs to products of the first safety class. The diameter is more than 4 m, the length of the apparatus is about 15 meters, weight - 340 tons. The equipment of one nuclear power unit includes four steam generators.

Previously, the vessel of the steam generator was assembled from four shells and welded together. In the welding process, more than 2,000 kg of flux and more than 12,000 meters of wire were used in total.

Currently the first steam generator vessel weighing up to 160 ton is finishing the machining process. Within a month, the item will be ready for installation of primary circuit header. The other three heat exchanger vessels are on different stages of production: machining, inspection performance.

Today at Atommash, there are 4 more steam generator vessels for Rooppur NPP second unit at different stages of manufacturing.

Source : Strategic Research Institute
voda
0
SNC-Lavalin to Deliver Additional High Integrity Containers to Fukushima Daiichi Nuclear Power Plant

SNC-Lavalin Group member Atkins Energy Global Solutions LLC announced that it has been selected by Tokyo Electric Power Company Holdings Inc to continue to deliver high integrity containers to store secondary radioactive waste from the processing of radioactive liquid effluents at the Fukushima Daiichi Nuclear Power Plant in Japan. This nuclear contract is within SNCL Engineering Services, the cornerstone of our strategy moving forward to greater growth and support for our partner and customer.

HICS are one element of a portfolio of nuclear products and technologies offered by SNC-Lavalin for nuclear waste management. SNC-Lavalin offers expertise throughout the entire nuclear life cycle from concept, design and technology development to new-build programs, and from asset management through waste management and decommissioning.

The events in March 2011 at the Fukushima Daiichi Nuclear Power Plant resulted in the need for a process to treat radioactive liquid waste. SNC-Lavalin’s advanced liquid waste processing system was transferred under license to our partner Toshiba to deploy for TEPCO at the Fukushima site. In January 2020, the ALPS technology was celebrated at Fukushima Daiichi, as a significant milestone in safely treating more than 1 million cubic meters of radioactive liquid effluent was achieved. In the ALPS treatment process, SNC-Lavalin’s HICs are used to store the radioactive solid waste generated during the liquid effluent decontamination process.

Source : Strategic Research Institute
Bijlage:
voda
0
Ignalina Nuclear Power Plant Decommissioning Reaches New Milestone

The decommissioning of the Ignalina nuclear power plant in Lithuania has reached a new milestone with the delivery of the final storage cask for spent nuclear fuel, one year ahead of schedule. These containers are used for the safe and secure storage of spent nuclear fuel assemblies that date from the time when the plant was operational. Lithuania closed the first unit at Ignalina in 2004 and the second in 2009 following safety concerns about its Soviet-designed RBMK-1500 reactors. The EBRD is managing the Ignalina International Decommissioning Support Fund, established in 2001. The decommissioning process is well advanced. An interim storage facility for spent fuel opened in October 2016 and has since received a total of 142 CONSTOR RBMK 1500-M2 casks loaded with 12,891 spent fuel assemblies from the Ignalina reactors and storage ponds of units 1 and 2.

A total of 190 CONSTOR RBMK 1500-M2 casks are to be loaded and transferred to the interim spent fuel storage facility by the end of 2022, with one CONSTOR RBMK 1500-M2 retained as a spare. The casks are supplied by GNS Gesellschaft für Nuklear-Service.

With the delivery of the final cask, Ignalina now has the full capacity to safely manage and store all spent nuclear fuel from the two RBMK-1500 reactors at the site.

The safe and secure storage of spent RBMK-1500 nuclear fuel from the INPP nuclear reactors and storage ponds is ensured in accordance with the requirements established in Lithuania, in compliance with EU standards and the recommendations of the International Atomic Energy Agency, and represents a key cornerstone in the overall decommissioning programme for Ignalina 1 and 2.

The EBRD-managed Ignalina International Decommissioning Support Fund is supported by the European Union, which has provided 96 per cent of the contributions. Other contributors include Austria,Belgium, Denmark, Finland, France, Germany, Luxembourg, Netherlands, Norway, Poland, Spain, Sweden,Switzerland and the United Kingdom.

Source : Strategic Research Institute
voda
0
Rosatom to Further Develop Cooperation with Bangladesh

Director General of the State Atomic Energy Corporation Rosatom, Alexey Likhachev, held a meeting with The Prime Minister of Bangladesh, Sheikh Hasina, during his visit to the People's Republic of Bangladesh. Issues of bilateral cooperation in the use of atomic energy for peaceful purposes were discussed. Mr. Likhachev also visited the construction site of the Rooppur NPP, the first nuclear power plant in Bangladesh. Members of the delegation examined facilities under construction and visited Green City, a special district especially built for Russian specialists.

During the visit, a package of documents was signed for the cooperation expansion in the field of nuclear energy. In particular, the parties signed a protocol to amend the intergovernmental agreement between the Government of the Russian Federation and the Government of the People's Republic of Bangladesh on the NPP construction on the territory of Bangladesh regarding the cooperation of the parties in providing assistance in the operation, maintenance and repairs of the Rooppur NPP. The protocol was signed by the Director General of the State Atomic Energy Corporation Rosatom Alexey Likhachev and the Minister of Science and Technology of the PRB Architect Yeafesh Osman.

The Protocol establishes the right of the Bangladeshi party to engage the Russian company on a long-term basis to help in the operation, maintenance and repair of Rooppur NPP 1 and 2 power units, as well as to supply the equipment, expendable materials, spare parts and to provide training for maintenance crews in the course of NPP operations. This will enable the Rosatom State Corporation to carry out maintenance, operational support and repair of the Rooppur NPP throughout its entire life cycle as part of assisting the Bangladeshi side in the operation of the Rooppur NPP.

In addition, a package of appendixes to the contract for the supply of nuclear fuel for Rooppur NPP was signed between TVEL JSC and the Bangladesh Atomic Energy Commission, in the presence of the Director General of Rosatom State Corporation Alexey Likhachev and the Minister of Science and Technology of Bangladesh, Architect Yeafesh Osman. The contract is valid until the end of the operational lifetime of both power units of Rooppur NPP. The power station will be the first nuclear power plant abroad constructed under the project of Generation III + (NPP-2006) and switched to an eighteen-month fuel cycle.

Rooppur NPP with two VVER-1200 reactors with a total capacity of 2,400 MW is being constructed under the Russian design 160 km away from Dhaka, the capital city of Bangladesh, in accordance with the general contract of December 25, 2015. The general contractor for Rooppur NPP construction is Atomstroyexport (Rosatom Engineering Division).

Source : Strategic Research Institute
voda
0
TVEL to Supply Fuel to Rez Nuclear Research Center in Czech Republic

TVEL has contracted supply of nuclear fuel for the LVR-15 research reactor at the Nuclear Research Center in Rez, the Czech Republic (Centrum vyzkumu Rez s.r.o., CVR). The contract covers fuel supply in 2020 and has a framework structure for future supplies on the request of the customer. LVR-15 is a 10 MW light water reactor, which historically has been using IRT-4M tubular fuel manufactured by the Novosibirsk Chemical Concentrates Plant (an enterprise of TVEL Fuel Company of ROSATOM). The reactor is the major facility of the research infrastructure at CVR, one of the leading nuclear physics and material science institutions in Europe.

Irradiation and post-irradiation studies at CVR are also carried out as part of development and verification of Russian fuel for large-scale commercial power reactors. In 2019, TVEL and CVR signed an agreement for material studies. In particular, scientific research in LVR-15 will include studying of radiation-induced growth and radiation-thermal creep of Russian-made zirconium alloys at low fluence of fast neutrons.

TVEL Fuel Company incorporates enterprises for the fabrication of nuclear fuel, conversion and enrichment of uranium, production of gas centrifuges, as well as research and design organizations. It is the only supplier of nuclear fuel for Russian nuclear power plants. TVEL Fuel Company of Rosatom provides nuclear fuel for 73 power reactors in 13 countries worldwide, research reactors in eight countries, as well as transport reactors of the Russian nuclear fleet. Every sixth power reactor in the world operates on fuel manufactured by TVEL.

Source : Strategic Research Institute
voda
0
ROSATOM Develops Nuclear Power Cooperation with Bangladesh

Alexey Likhachev, Director General of ROSATOM met with Prime Minister Sheikh Hasina Wazed in the People's Republic of Bangladesh. During the meeting, the Parties discussed issues of bilateral cooperation while development and use of nuclear energy for peaceful purposes. The delegation visited Rooppur NPP, the site for construction of the first Nuclear Power Plant in Bangladesh. In the course of the visit the Parties signed a package of documents, providing for further cooperation in the field of nuclear power. In particular, the Parties signed a Protocol on amending the Intergovernmental Agreement between the Government of the Russian Federation and the Government of the People's Republic of Bangladesh on construction of the Nuclear Power Plant in Bangladesh in terms of cooperation between the Parties for rendering assistance in operation, maintenance and repair of Rooppur NPP.

The Protocol confirms the right of the Bangladeshi Party to engage Russian organization on a long term basis to render assistance in operation, maintenance and repair of Rooppur NPP Unit 1 and 2 and supply the equipment, consumables and spare parts as well as to provide services on training of the operating and maintenance personnel during NPP operation . Based on this Protocol ROSATOM will be able to carry out maintenance, operational support and repair works at Rooppur NPP in the framework of assistance to the Bangladeshi Party in ensuring the operation of Rooppur NPP throughout its life cycle.

Rooppur NPP with two VVER-1200 reactors and the total capacity of 2400 MW is being constructed based on the Russian design, 160 km from Dhaka, the capital of Bangladesh, in accordance with General Contract dated December 25, 2015. The General Contractor for Rooppur NPP construction is Atomstroyexport (the engineering division of ROSATOM).

Source : Strategic Research Institute
voda
0
ROSATOM wins tender for Neutron-Flux Monitoring Equipment Modernization at Kozloduy NPP units 5 and 6

Rusatom Service JSC, electric power division of ROSATOM and Kozloduy NPP Bulgaria signed a contract on neutron-flux monitoring equipment modernization for units 5 and 6 of the plant. This contract was concluded, based on the results of a public tender, which was announced in September, 2019. Neutron-flux monitoring equipment plays an essential role in ensuring NPP safety and is used in VVER reactor control and protection systems.

Modernization of this system is a high-priority task. JSC OKB GIDROPRESS (the chief designer of Kozloduy NPP reactors) and National Research Center «Kurchatov Institute» (the plant’s nuclear research advisor) will be involved in approval of necessary technical documentation. JSC SNIIP Systematom, which has wide experience and references in similar projects, will act as a supplier of the main components of the equipment.

The Rusatom Service project portfolio for Kozloduy NPP in Bulgaria already includes a number of significant tasks, including a completed feasibility study for lifetime extension of the power unit No. 5-6 and modernization of turbogenerators for increased capacity to 104%.

Source : Strategic Research Institute
voda
0
Rosatom Starts 3D Printing of Venturi Valves for Ventilators

Rusatom-Additive Technologies, a subsidiary of Rosatom’s fuel company TVEL, has produced prototypes and is prepared to start 3D printing valves for Venturi oxygen masks – an important component of ventilators. The need for these valves has increased substantially due to the ongoing coronavirus COVID-19 pandemic. RusAT’s production facilities have the capacity to produce about 300 valves per week using a biocompatible polymer which does not require additional processing.

Venturi valves are used in conjunction with aerosol masks to provide oxygen at low flow rates. The valves are designed for short-term use, requiring replacement every few hours. 3D printing has emerged as a viable solution to help many countries solve the severe valve deficit that has arisen during this pandemic.

RusAT LLC is a specialized company - an integrator of the nuclear industry in additive manufacturing. The company's activities are focused on four key areas: 3D printers and their components production; creation of materials and metal powders for AM; development of software suite for additive manufacturing; outsourcing 3D printing services for clients and additive manufacturing introduction into production (including the organization of AM production centers).

Source : Strategic Research Institute
Bijlage:
voda
0
Power supply installed for Belarus NPP 2

On 31 March, the first 10kV power supply section was connected to unit 2 of the Belarus nuclear power plant, which is being built in Ostravets by Russian state nuclear corporation Rosatom. Providing the unit with electricity will allow specialists to begin full-scale commissioning. During the first 72 hours of continuous test operation, specialists will check the operability of all four sections of 10kV power supply system for normal operation (20VVA, 20VVV, 20VVS and 20VVD). After confirming their compliance with the design specifications, the electricity from this equipment can then be supplied to other facilities of the unit.

Belarus NPP will comprise two VVER-1200 reactors, scheduled to go online in 2020 and 2021, respectively. In February, Belarus' deputy energy minister Mikhail Mikhadyuk told the Respublika newspaper that unit 2 was 70% ready and that pre-commissioning tests were nearing completion at Belarus 1.

Source : Strategic Research Institute
voda
0
Russian scientists find Novovoronezh Nuclear Power Plant suitable for Neutrino Experiment

Rosatom’s electric power division Rosenergoatom, citing specialists from the Joint Institute for Nuclear Research in Russia’s Dubna, said that the sixth block of the Novovoronezh Nuclear Power Plant might become a venue for a number of experiments for the study of one of the most difficult particles to register, the neutrino. Research into neutrino properties is of high interest for fundamental physics, as it will provide insight into the design of the Universe. Besides, research of the neutrino is important for nuclear physics. In the future, these particles might become useful for remote monitoring of nuclear reactors’ operation.

A group of scientists from Dubna, together with nuclear security and reliability officers of the Novovoronezh NPP measured background conditions in the plant’s sixth block for one month. The conducted measurements will help the Institute’s physicists in the development of a special research installation. The final decision will be made following scrupulous analysis of all received data.

Source : Strategic Research Institute
Bijlage:
847 Posts, Pagina: « 1 2 3 4 5 6 ... 23 24 25 26 27 28 29 30 31 32 33 ... 39 40 41 42 43 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

AEX 870,27 -3,75 -0,43% 25 apr
AMX 916,54 -9,22 -1,00% 25 apr
ASCX 1.190,79 -16,28 -1,35% 25 apr
BEL 20 3.857,94 -25,89 -0,67% 25 apr
Germany40^ 17.931,00 +13,72 +0,08% 25 apr
US30^ 38.124,13 0,00 0,00% 25 apr
US500^ 5.044,94 0,00 0,00% 25 apr
Nasd100^ 17.428,55 0,00 0,00% 25 apr
Japan225^ 37.725,14 0,00 0,00% 25 apr
WTI 83,75 0,00 0,00% 25 apr
Brent 87,91 0,00 0,00% 25 apr
EUR/USD 1,0725 +0,0028 +0,26% 02:04
BTC/USD 63.979,87 -2.392,12 -3,60% 25 apr
Gold spot 2.331,35 -0,68 -0,03% 02:04
#/^ Index indications calculated real time, zie disclaimer
HOGE RENDEMENTEN OP DE IEX-MODELPORTEFEUILLES > WORD NU ABONNEE EN PROFITEER VAN MAAR LIEFST 67% KORTING!

Stijgers & Dalers

Stijgers Laatst +/- % tijd
UNILEVER PLC 47,590 +2,630 +5,85% 25 apr
KPN 3,436 +0,019 +0,56% 25 apr
Ahold Delhaize 27,880 +0,120 +0,43% 25 apr
Dalers Laatst +/- % tijd
ADYEN NV 1.157,000 -261,400 -18,43% 25 apr
BESI 136,000 -3,000 -2,16% 25 apr
Philips Koninklijke 19,265 -0,355 -1,81% 25 apr

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront