Windpower - Europe

1.192 Posts, Pagina: « 1 2 3 4 5 6 ... 55 56 57 58 59 60 | Laatste
Aantal posts per pagina:  20 50 100 | Omlaag ↓
voda
0
Tekmar Energy Secures French Contract

Tekmar Energy Limited has secured a contract award from French cable installation specialist Louis Dreyfus TravOcean, to supply TekLink cable protection systems for the Saint-Nazaire offshore wind farm. The contract marks Tekmar Energy’s first offshore wind project in France.The company will supply 160 patented TekLink Mechanical Latch CPS to protect the 33kV inter-array cables manufactured by Louis Dreyfus TravOcean's consortium partner Prysmian Group. With Prysmian tasked by project developers Eolien Maritime France manufacture the project's cable, Louis Dreyfus TravOcean has been tasked more than 100km of 33kV inter-array cabling.

The 480 MW Saint-Nazaire offshore wind farm will be located between 12 km and 20 km off the coast of the Guerande peninsula in western France. Water depths at the site range between 12 and 25 metres. The project is expected to generate enough electricity to supply 20% of the Loire-Atlantique department‘s power. It being developed by Eolien Maritime France (EMF), a project company co-owned by EDF Energies Nouvelles Group and Enbridge.

Source : Strategic Research Institute
Bijlage:
voda
0
GW of New Offshore Wind Capacity Installed Globally in 2019

The latest data released by the Global Wind Energy Council shows that the global offshore wind industry added 6.1GW of offshore wind capacity in 2019, a record year for the industry and an impressive 35.5 per cent increase on the previous year, which saw 4.5GW installed. This growth is set to accelerate, with GWEC Market Intelligence’s preliminary forecasts finding that an additional 50 GW of new offshore wind capacity could be installed by 2024 globally. This would mean that total installed offshore wind capacity could reach nearly 80 GW globally over the next five years, an increase of almost 172 per cent from today’s capacity.

Eight markets reported new offshore wind installations in 2019:
China – 2395 MW
United Kingdom – 1764 MW
Germany – 1111 MW
Denmark – 374 MW
Belgium – 370 MW
Taiwan – 120 MW
Portugal – 8 MW (floating)
Japan – 3 MW (floating)

GWEC CEO Ben Backwell sad “In 2019, we continued to see the strong growth trend of offshore wind, which now makes up 10 per cent of total wind energy installations. While mature markets in Europe continue to account for the majority of these installations, Asia Pacific is now increasingly contributing to this growth, with China leading the way as the global offshore wind leader in new capacity. It is also exciting to see floating wind capacity being installed in 2019, as once this technology reaches industrial scale, it will open up whole new markets and opportunities for offshore wind. Offshore wind is a huge opportunity to meet our climate targets, as it can replace expensive imported fuels, provide clean energy solutions to countries that have limited for land availability, and supply increasingly competitive zero-carbon energy at a massive scale. The economic benefits of offshore wind cannot be understated, with the potential to generate of hundreds of billions of dollars in investments, create tens of thousands of jobs and build a supply chain that can all contribute to thriving local economies.”

Source : Strategic Research Institute
voda
0
OX2 awards Nordex Group Contract for 48 MW Wind Farm in Sweden

The Nordex Group has again received an order from Nordic developer OX2. The Nordex Group will supply 12 N149/4.0-4.5 turbines for the 48 MW Ljungbyholm wind farm. The order also includes a premium service of the turbines with a term of 30 years. The “Ljungbyholm” project will be built near the town of Kalmar in southern Sweden. The Nordex Group installs the turbines on tubular steel towers with hub heights of 125 metres to achieve a high energy yield and not to exceed the total height of 200 meters.

The N149/4.0-4.5 turbines can be flexibly operated in different modes, depending on project requirements. In “Ljungbyholm” the installed capacity of the turbines will be 4.0 MW.

Start of construction of infrastructure works is scheduled to begin this spring, installation of the first components of the wind turbines is scheduled for the beginning of 2021. Once completed in mid-2021, “Ljungbyholm” will feed around 150 GWh of clean electricity into the Swedish grid every year.

Source : Strategic Research Institute
voda
0
Poolse opdracht Vestas

(ABM FN-Dow Jones) Vestas heeft een opdracht gekregen voor het leveren van windturbines voor drie Poolse projecten. Dit maakte de Deense producent van windturbines woensdag bekend zonder financiële details te geven.

In totaal gaat het om 68 megawatt en de turbines zullen vanaf het eerste kwartaal van 2021 worden geleverd.

Door: ABM Financial News.
info@abmfn.nl
Redactie: +31(0)20 26 28 999

© Copyright ABM Financial News B.V. All rights reserved.
voda
0
Total Enters Floating Offshore Wind Project in UK

Total has positioned itself on the floating offshore wind segment in line with its strategy to develop renewable energy. The Group has signed an agreement with the developer Simply Blue Energy to acquire 80% stake in the pioneering floating wind project Erebus located in the Celtic Sea, in Wales. The project will have a 96 megawatts capacity and will be installed in an area with water depth of 70 meters. This makes Total one of the first movers in this technology in the UK, the world’s largest offshore wind market.

While offshore wind has so far mainly developed in shallow water depths based on fixed bottom technology, floating wind offshore is set for strong growth in the years to come. This emerging technology has wide potential, opening access to sites further offshore, which have less impact on the landscape, and benefit from very high wind resources.

Source : Strategic Research Institute
voda
0
Vestas haalt Franse opdracht binnen

FONDS KOERS VERSCHIL VERSCHIL % BEURS
Vestas Wind Systems AS
72,46 -1,56 -2,11 % Frankfurter Wertpapierbörse (Xetra)
Vestas Wind Systems AS
DKK 542,20 -6,80 -1,24 % OMX Copenhagen

(ABM FN-Dow Jones) Vestas heeft in Frankrijk een order in de wacht gesleept voor de levering van V150-4.2 MW-turbines. Dit maakte de Deense producent van windturbines maandag bekend zonder financiële details te geven.

Het gaat in totaal om 26 turbines en een onderhoudscontract voor een periode van minimaal tien jaar, waarvoor naar verwachting in 2021 de levering plaatsvindt.

De koers van het aandeel Vestas daalde maandag 1,4 procent.

Door: ABM Financial News.
info@abmfn.nl
Redactie: +31(0)20 26 28 999

© Copyright ABM Financial News B.V. All rights reserved.
voda
0
Vestas Secures 47 MW Order in UK

Vestas has secured a 47 MW wind project in Northern Ireland from ERG, one of the leading wind energy operators in the European market, that will feature 13 V112-3.45 MW turbines in 3.6 MW operating mode to maximise energy production and deliver a competitive cost of energy. This order continues last year’s positive trend for Vestas in the UK’s post-subsidy market where it secured an order intake of more than 200 MW, confirming onshore wind energy’s increasing competitiveness in the UK.

The project will feature a VestasOnline® Business SCADA solution, lowering turbine downtime and thus optimising the energy output. The contract further includes supply, installation and commissioning of the wind turbines, as well as a 10-year Active Output Management 5000 (AOM 5000) service agreement.

Turbine deliveries are expected to begin in the second quarter of 2021, while commissioning is planned for the second and third quarter of 2021.

Source : Strategic Research Institute
voda
0
Trelleborg to Supply Cable Protection for Offshore Wind Farm Hornsea Two

Trelleborg’s applied technologies operation has been awarded a contract by leading renewable energy provider, Ørsted, to provide four integrated cable protection systems for Hornsea Two, the world’s largest offshore windfarm. Trelleborg’s NjordGuard cable protection system will be used to protect the inter array power cables from fatigue, over-bending and abrasion, at the entry point of the monopiles. Design, testing and manufacture of the NjordGuard cable protection system will take place in Trelleborg’s state-of-the-art manufacturing facility in the North of England. Project engineering works will commence immediately, with installation activities scheduled for execution in 2021.

NjordGuard is an integrated cable protection system, designed and developed to protect offshore windfarm and substation static power cables from over-bending, fatigue, abrasion and impact, in both monopile and J-tube applications. NjordGuard has an innovative design that protects the cable both during installation and throughout life. The product can be easily configured and is suitable for any diameter of cable. NjordGuard can be easily installed, removed and reused without the need for Remotely Operated Vehicles (ROVs) or diver intervention, using a patented field-proven ball and groove connector technology.

Hornsea Two comprises of 165 turbines will provide a combined total capacity of 1.4 GW. Located in the North Sea, 89 kilometers off the Yorkshire coast of the UK, Hornsea Two will provide green electricity to well over 1.3 million homes and is set for completion in 2022.

Source : Strategic Research Institute
voda
0
Nordex Group Obtains Major Order for 400 MW from Norway

The Nordex Group has received a large order for 400 MW from Norway using wind turbines in the 5 MW+ class. The Nordex Group will supply and install 72 N149/5.X turbines, with 105 meter steel towers, at the “Øyfjellet” wind farm for a German investor. Following completion of the project in autumn 2021, the Nordex Group will be responsible for full maintenance of the wind turbines on the basis of a Premium Service contract for a minimum period of 20 years, with options to extend this contract up to a total of 30 years.

The “Øyfjellet” project was developed by Eolus Vind, one of the largest developers of wind power in the Nordics. The project is located near the town of Mosjøen in the municipality of Vefsn. This location is characterised by strong wind conditions and cold climate, which provides an excellent fit for the latest 5.X configuration of the Delta4000 technology platform, together with Nordex’ anti-icing system. The area with its sparse vegetation lies at mountainous altitudes between 600 – 800 metres above sea level.

Eolus Vind signed a power purchase agreement (PPA) with Alcoa Norway in 2018. Alcoa will purchase the clean electricity generated in the “Oyfjellet” wind farm for 15 years in order to supply power to its aluminium production plant in nearby Mosjøen as well as the electricity needs of the local community.
“We are looking forward to cooperating with Nordex for the construction and operation of one of the most interesting wind power projects in Europe. Nordex flexible technology and experience from challenging Nordic conditions have been key success factors in our evaluation to find the best match for our 400 MW project. Together with Nordex and the investor we will supply the local industry and community with renewable electricity for decades” says Per Witalisson, CEO of Eolus.

Source : Strategic Research Institute
voda
0
Vestas secures 48 MW order from Italian auction

Vestas has received a 48 MW order for a project awarded in the first Italian auction held in October 2019. The contract includes the supply and installation of 14 V136-3.45 MW wind turbines, as well as a ten-year Active Output Management 4000 service agreement designed to ensure optimised performance for the lifetime of the project.

Since installing its first turbine in Italy in 1991, Vestas has led the country’s wind industry with over 4.3 GW capacity installed, being the main contributor to the expansion of wind energy with a 40 percent market share.

Turbine delivery will begin in the fourth quarter of 2020 with commissioning scheduled for the first quarter of 2021.

The project and customer are undisclosed.

Source : Strategic Research Institute
voda
0
Siemens Gamesa Securing Order for 170 Meter Rotor Onshore Turbine in Sweden

Siemens Gamesa continues to push the boundaries of onshore wind power following the first order for industry leading 170-meter rotor wind turbine. The company will deliver eight units of the SG 5.8-170 to Danish developer and wind turbine operator Eurowind Energy A/S for the Knöstad project (46 MW) located near Karlstad, in Sweden.

The landmark order will mark the debut of the onshore wind turbine with the largest rotor in the industry, capable of capturing more wind in medium and low wind sites. Additionally, the turbines will operate at a capacity of up to 6.2 MW, resulting in record high annual energy production (AEP). Siemens Gamesa has also secured a 25-year full-service agreement.

This will be the second project to feature the Siemens Gamesa 5.X platform in Sweden. In December, the company reached an agreement to supply 35 SG 5.8-155 to Arise AB and Foresight for the Skaftåsen project. In less than a year since its launch, the company has secured orders for the turbine’s two variants, which have rotors of 155 and 170 meters respectively.

Source : Strategic Research Institute
voda
0
RES Sells Buheii 79.8MW Wind Farm in Norway to GIG

Global independent renewable energy company RES has sold its Buheii wind farm to Macquarie’s Green Investment Group. Financial details of the investment have not been divulged by both companies. As per the terms of the agreement, RES has agreed to provide construction management and asset management services for the wind farm.

Developed by RES’s Nordic team, the 79.8MW Buheii onshore wind farm is situated in southern Norway. The wind power facility will be equipped with 19 Vestas V150 turbines, which are expected to generate clean energy and offset 15,000 tonnes of carbon emissions annually once fully operational.

Source : Strategic Research Institute
1.192 Posts, Pagina: « 1 2 3 4 5 6 ... 55 56 57 58 59 60 | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Plaats een reactie

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

AEX 471,46 -6,82 -1,43% 03 apr
AMS25-24h 469,25 -2,21 -0,47% 03 apr
AMX 641,18 -9,74 -1,50% 03 apr
ASCX 657,66 -20,47 -3,02% 03 apr
BEL 20 2.857,05 -38,35 -1,32% 03 apr
BRX20-24h 2.846,39 -10,66 -0,37% 03 apr
Germany30^ 9.545,46 +19,69 +0,21% 03 apr
Dutch15-index 13.217,07 -42,47 -0,32% 03 apr
Euro30-index 13.622,34 -131,33 -0,95% 03 apr
Citi Dow Jones... 21.053,67 -331,48 -1,55% 03 apr
Citi S&P 500 I... 2.488,60 -36,07 -1,43% 03 apr
Citi NASDAQ 7.526,83 -103,37 -1,35% 03 apr
Citi Nikkei In... 17.681,58 -375,15 -2,08% 03 apr
WTI 28,51 0,00 0,00% 03 apr
Brent 34,41 0,00 0,00% 03 apr
EUR/USD 1,0806 -0,0049 -0,45% 03 apr
BTC/USD 6.749,4300 -95,8100 -1,40% 01:45
Gold World Spo... 1.618,22 +2,12 +0,13% 03 apr
#/^ Index indications calculated real time, zie disclaimer

Stijgers & Dalers

Stijgers Laatst +/- % tijd
Ahold Delhaize 22,440 +0,830 +3,84% 03 apr
JUST EAT TAKEAWAY 72,580 +2,440 +3,48% 03 apr
DSM 104,300 +2,400 +2,36% 03 apr
Dalers Laatst +/- % tijd
UNIBAIL-RODAMCO-... 45,220 -4,500 -9,05% 03 apr
Aegon 2,090 -0,194 -8,49% 03 apr
ADYEN NV 691,200 -49,000 -6,62% 03 apr