voda
0
SSEN Commences Pentland Firth East cable Replacement Works

Scottish and Southern Electricity Networks is to commence its core work programme to replace one of the two submarine electricity distribution cables connecting Orkney to mainland Scotland, ensuring strengthened resilience of electricity supply to the islands ahead of the coming winter. The GBP 30 million cable replacement project, which received marine licence approval from Marine Scotland earlier this week, sees the installation of a new 33 kilovolt cable which follows the existing route from Murkle Bay, near Thurso, to Rackwick Bay on the island of Hoy.

The subsea cable replacement work will be undertaken by principal contractor, Global Offshore, with the cable expected to arrive by 15 July. Contract partners will support associated programme works, including near shore works, archaeological and ecological checks and works on the existing overhead network on Hoy.

The installation of the new cable will allow for the removal of some sections of existing overhead line on Hoy, to be replaced with underground cable. SSEN expects to complete all works by November, following an extension of the programme to avoid construction during bird breeding season on the island.

SSEN has been working closely with key stakeholders throughout the development of the programme, in recognition of the critical nature of the project, the impact of the coronavirus pandemic and associated travel restrictions.

All contractors working on the project will closely follow current Government guidance with measures taken to protect both the public and the construction teams. These include additional management of work and travel schedules, adherence to social distancing and the use of enhanced personal protective equipment.Scottish and Southern Electricity Networks is to commence its core work programme to replace one of the two submarine electricity distribution cables connecting Orkney to mainland Scotland, ensuring strengthened resilience of electricity supply to the islands ahead of the coming winter. The GBP 30 million cable replacement project, which received marine licence approval from Marine Scotland earlier this week, sees the installation of a new 33 kilovolt cable which follows the existing route from Murkle Bay, near Thurso, to Rackwick Bay on the island of Hoy.

The subsea cable replacement work will be undertaken by principal contractor, Global Offshore, with the cable expected to arrive by 15 July. Contract partners will support associated programme works, including near shore works, archaeological and ecological checks and works on the existing overhead network on Hoy.

The installation of the new cable will allow for the removal of some sections of existing overhead line on Hoy, to be replaced with underground cable. SSEN expects to complete all works by November, following an extension of the programme to avoid construction during bird breeding season on the island.

SSEN has been working closely with key stakeholders throughout the development of the programme, in recognition of the critical nature of the project, the impact of the coronavirus pandemic and associated travel restrictions.

All contractors working on the project will closely follow current Government guidance with measures taken to protect both the public and the construction teams. These include additional management of work and travel schedules, adherence to social distancing and the use of enhanced personal protective equipment.

SSEN is undertaking a significant programme of investment to replace around 90km of submarine cables connecting Scotland’s island communities by 2023 – a fifth of the total number currently in operation.

The Pentland Firth East cable was identified for replacement after routine inspections found it was coming to the end of its operational life. In July 2019, SSEN successfully completed repairs to the cable in Rackwick Bay following a cable fault. While customer power supplies were not impacted by this fault, a long-term solution was required to maintain a safe, secure and reliable power supply to homes and businesses in Orkney.

Source : Strategic Research Institute
voda
0
Wärtsilä Bags 200 MW Power Plant Contract in South America

The technology group Wärtsilä will supply a flexible baseload 200 MW power plant to a country in the Northern Andes. The flexibility of the efficient yet fast-starting Wärtsilä solution will provide the grid balancing capability that is essential with increasing amounts of intermittent wind and solar power generation entering the power systems. At the same time, it will serve as a capacity plant to back up the system in cases of shortage. The contract was signed in June.

Commercial operation is scheduled to commence at the end of 2021. When operational, the 200 MW plant will supply electricity to the national grid. The plant will be powered by 11 Wärtsilä 50SG engines running on natural gas. Wärtsilä is supplying and installing the plant on a full engineering, procurement, and construction basis.

Source : Strategic Research Institute
Bijlage:
voda
0
EBRD Concerned About Situation in Ukrainian Renewable Energy Sector

The European Bank for Reconstruction and Development is seriously concerned about the current situation in the Ukrainian Renewable Energy Sector. The EBRD welcomed the mediation led by the Energy Community Secretariat between renewable energy investors and the Ukrainian authorities aiming to find a balanced and consensual restructuring of the renewables support scheme. However, while the process has secured agreement in many areas, it continues to raise concerns with many investors, who may face material financial losses if it is implemented in the current form. The Verkhovna Rada is now considering Draft Law 3658, based on the memorandum. While the EBRD supports many of the elements in it, we urge the administration and legislators to continue their dialogue with investors in order to reach a consensual solution which is supported by the sector as a whole.

To date, Ukraine’s renewable sector has delivered more than 5 GW of clean, local electricity generating capacity, creating jobs and paying taxes across the country, while attracting billions of Euros of domestic and foreign investment.

The EBRD therefore urges all stakeholders to preserve this success. A consensual solution would reduce the cost of renewable electricity for consumers while also demonstrating, both at home and abroad, the resilience, stability and predictability of the Ukrainian investment environment.

Source : Strategic Research Institute
voda
0
GE Bags 3 Orders to Implement Air Quality Control Systems Technology in India

GE Power India Limited has been awarded three contracts for a combined value of USD 112.6 million to supply its best-in-class air quality control systems solutions to Hindalco Industries Limited, NTPC Limited & UP Rajya Vidyut Utpadan Nigam. GE’s AQCS portfolio of products offers advanced air pollution control engineering, from process and equipment design to construction, operations, and maintenance.

Hindalco Industries Limited (1x150MW) for their Aditya Aluminium Plant Lapanga in Sambalpur, Odisha have committed to setting up the India’s first ever Semi Dry FGD, a one of its kind system under the Make-in-India intiative to reduce the SO2 emission within permissible limits. The project is expected to be commissioned by 2021. The scope includes design, engineering, supply, installation, commissioning & civil and structural work of FGD solutions. This technology will give a number of benefits as it facilitates SO2 removal with lower water consumption, smaller footprint, utilization of existing stack, lesser lifecycle cost and lesser implementation time.

NTPC Limited for their Feroze Gandhi Unchahar Thermal Power Project Stage-I, II & III (2x210MW + 2x210 MW + 1x210MW) in Rae Bareli, Uttar Pradesh. This is GE Steam Power’s first Wet FGD order to install common absorber for a combination of multiple boiler units. This landmark order is expected to be completed by February 2023. This will help to treat 8.4 million m3/ hour of Flue Gas and remove ~63,000 tons/Year of SO2 thereby complying with the new emission norms to reduce the level of SOx in emissions from thermal power plants. The scope includes design, engineering, supply, installation, commissioning & civil and structural work of FGD solutions (along with auxiliaries including limestone and gypsum handling systems and wet stack) on a full turnkey basis.

UP Rajya Vidyut Utpadan Nigam will be setting up a combustion system modification of the boilers along with advanced firing system equipment to meet the NOx emission norms for their Harduaganj, Parichha and Anpara plants. The order is a first for combustion modification for NOx control by any state utility in India.

Source : Strategic Research Institute
[verwijderd]
0
oilprice.com/Energy/Crude-Oil/Russia-...

Russia Delivers First Arctic Oil To Key Ally China

Last week saw Russia’s Gazprom Neft, the country’s third biggest oil company by output and the oil arm of state gas giant Gazprom, ship its first cargo of oil produced in the Arctic to China via the Northern Sea Route (NSR)
voda
0
Wärtsilä to Deliver Hybrid LPG LFO Fuelled Power Plant to US Virgin Islands

The technology group Wärtsilä has been awarded a contract to deliver a state-of-the-art power plant and energy storage system to the US Virgin Islands Water and Power Authority. The plant will be delivered and installed on an engineering, procurement, and construction basis. It will be exceptional in that it will be capable of burning both liquid petroleum gas and light fuel oil, while also being fitted with batteries utilising Wärtsilä’s state of the art GEMS energy management platform to provide optimised energy operations. The order was booked by Wärtsilä in June 2020.The four Wärtsilä 32LG engines will deliver a total output of 36 MW, while the energy storage system will add further 9 MW for up to two-hours. In addition to being Wärtsilä’s first engine & hybrid power plant sale, this will also be the first installation of the Wärtsilä LG engines, and the company’s first engines capable of burning both LPG and LFO.

It will improve the system’s reliability, while at the same time giving us additional fuel and operational flexibility that will increase fuel efficiency and lower overall operating costs. It will also reduce the dependence and environmental impact of diesel oil. The four generators are fueled by a cleaner burning fuel which will lead to reduced air emissions and enhanced overall air quality. There is no adverse impact to land, water or the surrounding areas

Additionally, the hybrid solution will add even more operational flexibility and will serve to improve the existing grid stability on the island

The project is scheduled to be completed with a fully operational plant by spring 2022. Wärtsilä has previously supplied and installed a 21 MW power plant running primarily on propane gas to WAPA.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Winstval voor Equinor

(ABM FN-Dow Jones) Equinor heeft het afgelopen kwartaal de resultaten zwaar onder druk zien staan door met name lage olie- en gasprijzen. Dit maakte de Noorse energiegigant vrijdag voorbeurs bekend.

Equinor behaalde in het afgelopen kwartaal een aangepaste winst voor belastingen van 350 miljoen dollar. Vorig jaar lag de winst voor belastingen nog op 3,15 miljard dollar.

Het energiebedrijf, waarbij energie wordt gewonnen uit olie, gas en wind, had te kampen met zeer lage prijzen voor olie en gas, terwijl de handelstak juist profiteerde van de volatiele marktomstandigheden.

Het bedrijf voorziet volgens topman Eldar Sætre dat de volatiliteit hoog zal blijven, en dat de langere termijn gevolgen van Covid-19 nog lang voelbaar zullen zijn, hetgeen zich vertaald in een lagere vraag alsook in lagere investeringen.

De operationele kasstroom kwam in de eerste zes maanden uit op 6,9 miljard dollar. Dat was 12,0 miljard dollar een jaar eerder.

Aandeelhouders van Equinor kunnen een kwartaaldividend van 0,09 dollar per aandeel tegemoet zien. Eind april verlaagde Equinor het dividend met 67 procent vanwege de daling van de olieprijs. Ook werd toen gestopt met het inkopen van eigen aandelen en de investeringen werden verlaagd.

"Met de genoemde stappen kan Equinor met een neutrale kasstroom werken bij een gemiddelde olieprijs van 25 dollar per vat voor de rest van het jaar", stelde het energiebedrijf toen.

Door: ABM Financial News.
info@abmfn.nl
Redactie: +31(0)20 26 28 999

© Copyright ABM Financial News B.V. All rights reserved.
[verwijderd]
0
www.youtube.com/watch?v=jaGMiiJDK8Q

Sneak peek of world's 2nd largest hydropower station
southwest China's Baihetan, the world's 2nd largest hydropower station.

voda
0
Clancy Secures ED1SON Alliance Extension with UK Power Networks

Clancy has secured a four-year extension to its partnership with UK Power Networks as part of the ground-breaking ED1SON contracting Alliance. Working alongside Alliance partners Kier and Morrison Utilities, the extension will see Clancy maintain momentum on UK Power Networks ongoing GBP 1 billion capital investment programme across London, the South East and East of England. Initially launched in 2015, ED1SON was designed to bring together the skills of contractors and consultants within a continuous work programme to ensure greater efficiency and innovation, ultimately delivering value for UK Power Networks’ customers. The extended Alliance will run until 2024.

The Alliance has established a collaborative supply chain model geared to navigating complex projects while building its overall capability. A culture of continuous improvement and keen focus on safety has seen the Alliance deliver over a million working hours without a lost time incidence since 2017.

Key capital projects for Clancy and its partners over this period have included major cable upgrades across south London and the delivery of a new substation and 320 metre cable tunnel to support the regeneration of Battersea Power Station. The achievements of the Battersea project and especially the strength of the contracting team has been recognised by awards from New Civil Engineer and the Institute of Civil Engineers.

Source : STRATEGIC RESEARCH INSTITUTE
voda
0
Repsol Buys Renewables Assets in Chile

Repsol continues its expansion in renewable energy with the signing of an agreement with Grupo Ibereólica Renovables that gives Repsol access to a portfolio in Chile of projects in operation, construction, or development of more than 1,600 MW in 2025, with the possibility, thanks to this agreement, to exceed 2,600 MW in 2030. Repsol and Grupo Ibereólica Renovables will create a joint venture in Chile with each party holding 50%, through an increase of capital of 168 million euros to be disbursed by Repsol through 2023.

The funds incorporated in the increase of capital will strengthen the joint venture’s resources and will allow five renewables projects to be developed and built over the next five years in Chile, with a total installed capacity of more than 1,600 MW, comprising three wind farms and two solar farms.

Repsol thus gains access to quality assets and a good future pipeline in a stable market such as Chile, already well consolidated in the renewable sector and for which growth is forecast thanks to the existence of areas with abundant sun and wind resources.

The joint venture in Chile will have a diversified portfolio of assets (52% wind and 48% solar) which are distributed into 78 MW of renewable generation capacity already in operation, 110 MW under construction, 1,500 MW in advanced stages of development which will be operational in 2025 and another 1,000 MW planned for 2030, located mainly in the northern regions of Antofagasta and Atacama.

The agreement gives the multi-energy company the option to take control of the venture from 2025.

Source : STRATEGIC RESEARCH INSTITUTE
2.991 Posts, Pagina: « 1 2 3 4 5 6 ... 118 119 120 121 122 123 124 125 126 127 128 ... 146 147 148 149 150 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

AEX 878,83 -3,44 -0,39% 30 apr
AMX 915,44 -10,56 -1,14% 30 apr
ASCX 1.190,39 -17,42 -1,44% 30 apr
BEL 20 3.883,26 -3,50 -0,09% 30 apr
Germany40^ 17.905,20 -213,12 -1,18% 30 apr
US30^ 38.043,99 0,00 0,00% 30 apr
US500^ 5.063,57 0,00 0,00% 30 apr
Nasd100^ 17.570,06 0,00 0,00% 30 apr
Japan225^ 38.318,54 0,00 0,00% 30 apr
WTI 81,58 -1,12 -1,35% 30 apr
Brent 85,94 -1,23 -1,41% 30 apr
EUR/USD 1,0713 +0,0043 +0,41% 23:14
BTC/USD 57.374,30 -5.714,23 -9,06% 23:14
Gold spot 2.319,22 -16,65 -0,71% 23:05
#/^ Index indications calculated real time, zie disclaimer
HOGE RENDEMENTEN OP DE IEX-MODELPORTEFEUILLES > WORD NU ABONNEE EN PROFITEER VAN MAAR LIEFST 67% KORTING!

Aandelenadviezen van IEX.nl

  1. Premium
    Advieswijziging ASML
  2. Premium
    Iets langer geduld met Besi
  3. Premium
  4. Premium
    Uitbundige korting op het aandeel Exor
  5. Premium
    Logische herfinanciering Pharming

Stijgers & Dalers

Stijgers Laatst +/- % tijd
Ahold Delhaize 28,440 +0,330 +1,17% 30 apr
UNILEVER PLC 48,500 +0,440 +0,92% 30 apr
ASR Nederland 46,970 +0,180 +0,38% 30 apr
Dalers Laatst +/- % tijd
EXOR NV 102,700 -2,400 -2,28% 30 apr
ArcelorMittal 23,590 -0,460 -1,91% 30 apr
ADYEN NV 1.130,200 -20,800 -1,81% 30 apr

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront