voda
0
Ameren Missouri No longer plans to acquire an up-to 157 MW facility in northwest Missouri

Ameren Missouri, a subsidiary of Ameren Corporation announced that it has mutually agreed with EDF Renewables Inc to terminate the development of an up-to 157 MW wind facility in Atchison County, Missouri. Mr Michael Moehn, chairman and president of Ameren Missouri said that "Significant upgrades would have been required on the transmission system to accommodate this project, leading to unacceptably high costs. While we're focused on incorporating more renewable energy, we also have to be good financial stewards for our customers, who trust us to provide safe, reliable energy while keeping rates stable and predictable. While it is disappointing we will not be moving forward with this project, we remain focused on seeing our other, larger projects through to the finish line."

Ameren Missouri remains strongly committed to meeting its goal of owning at least 700 MW of new wind generation by the end of 2020 with two Missouri-based projects under agreement to build:

Mr Moehn said Ameren Missouri is pleased to have received the third and final phase of the expected regional transmission organization interconnection costs for both projects, which were in-line with expectations. Final interconnection agreements are expected this Fall.

Source : Strategic Research Institute
Joni-2
0
NextEra Energy, Inc. bouwt grootste gecombineerde, Wind, Zon en energieopslag park in de USA met een totale capaciteit van 700 MW.

steelguru.com/power/nextera-to-build-...
voda
0
Eletrobras Resumes Sale of Wind Companies

Bnamericas reported that Brazil's state-run power giant Eletrobras resumed the process to sell 39 specific purpose companies totaling more than 980MW in generation capacity as part of a plan to reduce debt. The companies on sale are the ones remaining after a USD 320 million auction last September that saw the sale of 11 of the 18 lots containing a total of 71 SPEs.

Eletrobras will now offer six lots, of which five are wind power generation assets and one being a transmission project.

Companies interested in bidding for the assets can register until August 12.

Lot 1: It consists of Santa Vitoria do Palmar Holding, which controls 18 specific purpose companies with participation in wind power generation parks in Rio Grande do Sul state totaling 402MW of installed capacity.

Lot 2: The company winning this lot will assume four wind power firms, the Eólica Hermenegildo I, II and III, in addition to Eolica Chui IX, also in Rio Grande do Sul state. Together, they operate wind parks with capacity amounting to approximately 181MW.

Lot 3: This lot comprises the Chapada do Piauí I Holding, which controls eight SPEs that operate seven wind parks located in Piauí’s state, with 115 turbines and 205MW of installed capacity.

Lot 4: The winning firm will assume control over Chapada do Piauí II Holding that controls seven SPEs, which operate six wind parks in Piauí state totaling 100 turbines and 172MW of installed capacity.

Lot 5: The SPE sold in this lot is related to wind power firm Eólica Mangue Seco 2. The company operates a wind complex composed of 13 turbines with 2GW capacity each, located near the Clara Camarão refinery, in Rio Grande do Norte state.

Lot 6: It comprises Manaus Transmissora de Energia, responsible for the operation and maintenance of the 559km Oriximiná-Itacoatiara-Cariri transmission line, which crosses 13 Brazilian municipalities in the states of Pará and Amazonas.

Source : Bnamericas
voda
0
Dominion Energy's Offshore Wind Project Moves Forward

Dominion Energy’s Coastal Virginia Offshore Wind project is moving forward. Onshore construction started in June. Now, there's a barge that started offshore construction off the coast of Virginia Beach. It launched from the shore on Tuesday. Dominion's project is working to build two 6-megawatt wind turbines, 27 miles off the coast. It's expected to power up to 3,000 homes.

The company said the barge will remain about a half-mile from shore through the end of August. It supports the installation of a half-mile conduit that will hold the final stretch of cables connecting two wind turbines to a new substation near Camp Pendleton.

Governor Northam said that “The Virginia offshore wind demonstration project is another powerful example of the Commonwealth’s position as a leader in renewable energy. As the first deployment of commercial-scale offshore wind turbines in federal waters, I am thrilled that Virginia’s project will help determine best practices for future offshore wind construction along the East Coast.”

Dominion Energy anticipates the two turbines should be in operation by late 2020.

Source : Strategic Research Institute
voda
0
LINX CCG Supports Wind Turbine Freight Task in Victoria

Logistics company, LINX Cargo Care Group is part of a sustainable supply chain at Lascelles Wharf, Geelong, where it is stevedoring wind turbines set for Moorabool Windfarm in Victoria. LINX CCG has safely managed the port-side operations of a USD 370 million renewable energy project over a four-month period to support Bollore Logistics in its logistics network from the ship to the Windfarm.

LINX CCG is reported to be providing cargo unloading and container handling services to enable the Windfarm to receive the wind turbines in the same, new condition in which they were shipped. Minimising the risk of cargo damage helps Bollore Logistics uphold its contract obligations and gives them peace of mind.

The Moorabool Windfarm is located approximately four kilometres south of Ballan in Victoria and is being developed in two stages. Upon completion, the Windfarm will boast 107 wind turbines which will altogether generate 321 megawatts in renewable energy to power an average of 200,000 Victorian homes each year.

LINX Operations Manager, Mr Andrew Hill, believes it’s rewarding for LINX to be involved in a project like the Moorabool Windfarm which develops sustainable energy sources in Australia. He said that “Our stevedores are well versed in handling wind turbines therefore we’re able to offer Bollore Logistics problem solving and solutions-based operations. With the growth in the renewable energy industry, our experience in this area positions us well to secure future contracts with companies like Bollore Logistics.”

Source : Strategic Research Institute
voda
0
Swancor Holding Sells 95% Share in Swancor Renewable

Swancor Holding Co said that it has closed a deal to sell a 95% stake in Swancor Renewable Energy Co to New York-based Stonepeak Oceanview Holdings Co for between USD 25 million and USD 101 million.

The company, whose core business includes resins and composite materials manufacturing, said the sale is part of its plan to expand the production of composite materials for wind turbines in Taiwan.

The company first disclosed its intention to sell its shares in Swancor Renewable Energy in June, prompting speculation that it would completely exit the offshore wind farm business.

However, as Swancor Renewable Energy owns a 25% stake in Formosa II Wind Power Co, which is working on a 376 megawatt project due to be completed by the end of next year, Swancor Holdings still holds a 1.25% stake in the wind farm being built off Miaoli County’s Jhunan Township.

Swancor Holding is also developing the second phase of Formosa I Wind Power Co, Taiwan’s first offshore wind farm, also off the Miaoli coast. It installed the first wind turbine last week.

Source : Strategic Research Institute
voda
0
Wind Energy is Key in Ensuring a Reliable, Cost-Effective and Clean Electricity Supply Across Canada

The Canadian Wind Energy Association is issuing the following statement in response to the Fraser Institute’s report called Generating Electricity in Canada from Wind and Sunlight: Is Getting Less for More Better than Getting More for Less?

Mr Jean François Nolet, Vice-President, Policy, Government and Public Affairs, CanWEA said that “The Fraser Institute has missed the mark on the facts and conclusions in its analysis of the contributions renewable energy is making in Canada. Wind energy provides reliable, cost-effective and clean electricity to provincial grids while generating local economic development, creating thousands of jobs and reducing carbon emissions across Canada. Wind energy is the lowest-cost option for new electricity supply in Canada and is a corner stone to helping electrify the economy and meeting climate commitments. The wind energy industry is committed to working with communities, governments and system operators to ensure the responsible and sustainable development of the wind energy industry in Canada as the electricity grid is transformed to power a low-carbon future.”

Source : Strategic Research Institute
voda
0
Enel Green Starts Construction of Two New Wind Farms US

Enel, through its US renewables company Enel Green Power North America Inc, has started construction of two new wind farms in the US totalling around 300 MW of new renewable capacity. These new wind facilities, together with the 450 MW High Lonesome wind project and the 497 MW1 Roadrunner solar project, both being built in Upton County, Texas, bring the company’s total renewable capacity under construction in the country to around 1,250 MW.

The 66 MW Whitney Hill wind project is located in Logan County, Illinois, adjacent to the company’s existing 185 MW HillTopper wind farm that began commercial operation in December 2018. Whitney Hill is expected to begin operations by the end of 2019, generating around 246 GWh annually, equivalent to approximately 167,000 tons of CO2 emissions avoided each year. Both the Whitney Hill and HillTopper wind projects were developed by Swift Current Energy.

The 236.5 MW White Cloud wind project is located in Nodaway County, Missouri. Once operational, expected by the second half of 2020, the project will be able to generate around 950 GWh annually, avoiding the emission of approximately 643,000 tons of CO2 per year. White Cloud will be Enel Green Power’s second wind farm in the state, as the company already operates the 300 MW Rock Creek wind farm in Atchison County, Missouri, which began operations in 2017.

Mr Georgios Papadimitriou, Head of Enel Green Power North America said that “Today’s announcement reinforces our commitment to continued growth throughout the country. These projects will enable us to further capitalize on the abundant wind resource in the central US as we continue to expand our footprint in this region and increase the geographical diversification of our portfolio.”

Source : Strategic Research Institute
Bijlage:
voda
0
Apex Chooses Power Factors to Manage Renewable Assets

Apex Clean Energy, Inc has selected Power Factors to provide the technical asset management platform for its renewable projects. Mr Gary Meyers, president of Power Factors said that “Our goal is to partner with industry leaders that are pushing technology limits to ensure we deliver the very best renewables system of engagement to drive down LCOE.”

Mr Meyers added that “As a leader in the wind and solar renewables market, Apex will drive us, and together we will make renewable energy the most affordable energy source on the planet.”

Apex Clean Energy is deploying the Power Factors platform to manage a diverse and growing portfolio of wind and solar assets, totaling more than 1,250 MW across 13 facilities in North America.

Mr Neil James, VP of operations, maintenance, and monitoring for Apex said that “We are pleased to partner with Power Factors to integrate their premiere software solutions, which will allow Apex to enhance project performance, pass efficiencies along to customers, and ultimately, accelerate the shift to clean energy.”

Source : Wind Power Engineering
voda
0
Infrastructure And Energy Alternatives Announces Wind Contract Award

Infrastructure and Energy Alternatives, Inc a leading infrastructure construction company with specialized energy and heavy civil expertise, announced a new wind energy project award. The award is for construction of the Neosho Ridge Wind project in Neosho County, Kansas, an approximate 300-megawatt project that is expected to provide enough energy to power up to 100,000 homes. The power generated by the project’s planned 139 Vestas turbines will be delivered into the Kansas electrical grid.

Apex Clean Energy, which develops, constructs and operates utility-scale wind and solar power facilities across North America, is the lead developer on the project.

Once IEA receives Full Notice to Proceed, the scope of IEA’s work will include wind turbine installation, public road maintenance, turbine access roads, MV collection system installation and the construction of a high voltage project substation and transmission line connecting the project to the electrical grid. Project work is scheduled to commence in August 2019 and completion is expected in the fourth quarter of 2020.

JP Roehm, IEA’s Chief Executive Officer said that “The Neosho Ridge Wind project is an excellent example of the continued strong demand for clean energy and the ongoing opportunities we see as the leader in the wind construction business.”

The US wind power industry increased its overall capacity by 8% in 2018 to 96,433 megawatts. That more than doubled the capacity level at the start of this decade and is enough to power more than 30 million homes, according to American Wind Energy Association data. New private investment in wind projects installed in 2018 alone exceeded USD 12 billion.

Additionally, as the cost of developing renewable energy continues to decline, new-build wind capacity is projected to become cost-competitive with existing conventional energy plants in the next decade, according to a 2019 McKinsey & Company analysis. As such, McKinsey forecasts continued growth in renewable energy investments, including wind, for several years. The share of renewables in global power generation could grow from around 25% today to 50% by 2035 and 75% by 2050, according to the McKinsey report.

Source : Strategic Research Institute
voda
0
Nordex Group Receives Order for 269 MW Wind Turbines From USA

The Nordex Group has received another large order for the N149/4.0-4.5 from the Delta4000 series. The order includes a total of 56 turbines as well as a two-years service contract for a project in the United States. Installation of this project in the North of the USA is scheduled to start in summer 2020. The machines are to be operated in the 4.8 MW mode and are to be supplied in the "Cold Climate" version. This option offers an extended operating range enabling the turbines to operate down to an outside temperature of -30 degrees Celsius.

Mr Patxi Landa, CSO of the Nordex Group said that "After recording significant new business with our N149/4.0-4.5 in the USA in the course of this year, this new order underlines the continuing strong demand from customers for our turbines of the Delta4000 generation.”

Source : Strategic Research Institute
voda
0
Infrastructure and Energy Alternatives to Construct Wind Project in Nebraska

Infrastructure and Energy Alternatives, Inc announced a new wind energy project award valued at approximately USD 98 million. The award is for construction of the Milligan 1 Wind Farm in Saline County in southeast Nebraska. This is a 300-megawatt project that is expected to provide enough energy to power up to 115,000 homes. The power generated by the project’s planned 99 turbines will be delivered into the Southwest Power Pool electrical grid. The wind farm, which is located near Nebraska’s capital city of Lincoln, will draw upon power generated from a combination of Vestas V110, Siemens 129 and Siemens 145 turbines. Work on the Milligan 1 project is scheduled to begin in September with full operation by November 2020.

EDF Renewables North America is the lead developer on the project. The company is a market leading independent power producer and service provider with over 30 years of expertise in renewable energy. The company delivers grid-scale power: wind (onshore and offshore), solar photovoltaic, and storage projects; distributed solutions: solar, solar+storage, EV charging and energy management; and asset optimization: technical, operational, and commercial skills to maximize performance of generating projects. EDF Renewables’ North American portfolio consists of 16 GW of developed projects and 10 GW under service contracts. EDF Renewables North America is a subsidiary of EDF Renewables, the dedicated renewable energy affiliate of the EDF Group.

The scope of IEA’s work on Milligan 1 Wind includes engineering and construction of the turbine foundations, turbine access roads, MV collection system, wind turbine installation and construction of the on-site operations and maintenance building.

Mr JP Roehm, IEA’s Chief Executive Officer said that “This significant new project in Nebraska is indicative of the ongoing strong demand for wind power that we are experiencing this year.”

Source : Strategic Research Institute
voda
0
Record US Wind Farm Development Activity in 2Q - AWEA

US wind farm development activity rose to a new high point in the second quarter of 2019, according to new data released today by the American Wind Energy Association. Strong consumer demand from Fortune 500 businesses and utilities as well as calls from multiple states for offshore projects added to wind power’s growing development pipeline. At the same time, wind turbine manufacturers saw an increasing number of factory orders for more powerful wind turbines capable of powering almost twice the number of homes as an average wind turbine installed in the past few years.

These findings and the latest industry data are highlighted in AWEA’s newly released US Wind Industry Second Quarter 2019 Market Report. AWEA market reports provide an authoritative status update for the US wind energy industry, which continues to supply a growing share of the American electricity generation while creating well-paying careers and economic opportunity in communities across the country.

AWEA CEO Tom Kiernan said that “American wind power’s record growth continues to accelerate with over 200 wind farm projects underway in 33 states. Our industry’s success strengthens the US economy because access to affordable, clean American wind power is a competitive advantage in the eyes of business leaders. And when those businesses invest in US wind energy, it directly benefits the people living and working in our country’s farm, factory, and port communities.”

The record 41,801 MW of US wind capacity currently under construction or in advanced stages of development represents a 10% increase over the level of activity this time last year. The wind project pipeline grew 7% in the second quarter with 7,290 MW in new construction and advanced development activity announced.

Wind power is expanding rapidly in many regions of the US Over 200 wind projects are underway across 33 states, and 15 of those states have over 1,000 MW of wind capacity that will come online in the near term. Texas currently hosts the most activity (9,015 MW), followed by Wyoming (4,831 MW), New Mexico (2,774 MW), Iowa (2,623 MW), and South Dakota (2,183 MW). Notably, half of all U.S. states have enough projects underway to grow their installed wind capacity by 25 percent or more.

Offshore wind also saw significant activity in the second quarter with bold new offshore wind targets legislated in Maryland (1,200 MW), Connecticut (2,000 MW), and New York (9,000 MW). New Jersey granted its first offshore renewable energy certificate award to Ørsted’s 1,100 MW Ocean Wind project the largest offshore project planned in the US so far. And the activity hasn’t slowed; early in the third quarter, New York Governor Cuomo announced Empire Wind and Sunrise Wind as winners of the state’s first call for offshore wind project proposals.

Mr Kiernan said that “We’re seeing a growing number of wind farms select turbines capable of powering nearly twice as many homes as the average U.S. wind turbine. Wind technology innovation is keeping pace with demand, but we can’t afford to neglect the power grid infrastructure that delivers electricity from where it’s made to consumers. We continue to urge the Administration, Congress, FERC, and grid operators to ensure well-designed transmission lines can be planned, permitted, and built in a timely fashion.”

Source : Strategic Research Institute
voda
0
Scout Clean Gets Construction Permit for 200MW Sweetland Wind Farm

Scout Clean Energy a Colorado based renewable energy developer-owner operator announced the South Dakota Public Utilities Commission granted approval for a construction permit for the 200 MW Sweetland Wind Farm (Sweetland) in Miller, South Dakota. The Sweetland Wind Farm project will span 20,000-acres in southeastern Hand County and include up to 71 GE 2.82 MW series wind turbines.

Sweetland Wind Farm filed its application with the PUC in March and a public input meeting was held in Miller in April. Prior to receiving PUC Commission approval, the project worked extensively with PUC Staff, the local community and stakeholders to ensure all concerns were addressed. The Permit that was granted reflects all parties working together to reach a favorable outcome for the project, stakeholders and South Dakotans. Scout now turns their attention to marketing the power. The project will result in 200 temporary construction jobs and 10 permanent full-time positions once the facility begins operation. The community economic benefits are estimated to generate USD 35 million dollars in tax revenue over the life of the project, generating a little over one million dollars a year in new tax revenues.

Mr Michael Rucker, CEO and founder of Scout Clean Energy said that "We are excited to have received the PUC's unanimous approval for the state construction permits for the Sweetland wind farm. The approval means Scout now can take the power to market and begin planning for construction as early as 2020."

Mr Rucker said that "We are very fortunate to have a 200 MW project fully permitted in South Dakota. The project's top tier wind resource and strategic location in the Southwest Power Pool make it attractive for potential investors looking to expand their renewable energy footprint in the region. We have already had significant interest in the project and are working toward completing a power purchase agreement."

Source : Strategic Research Institute
voda
0
Equinor Joins Wind Farm Development in Argentina

Equinor and YPF Luz announced that the companies have entered an agreement where a subsidiary of Equinor will subscribe to shares in Luz del León. Luz del León is the company in charge of the Cañadón León wind farm project, currently under construction, located in the province of Santa Cruz in Argentina. The shareholders of YPF Luz are YPF S.A and an affiliate of General Electric.

The agreement establishes that Equinor will have a 50% stake of Luz del León, with an equity contribution of USD 30 million. After the subscription and capital integration, YPF Luz and Equinor will jointly control Luz del León, while YPF Luz will be in charge of the operations of the Cañadón León Wind Farm project. After the completion of the works, the wind farm will have a capacity of about 120 MW of power and a total investment estimated to around USD 190 million.

The total installed capacity and power has already been sold to CAMMESA under the RENOVAR 2 Program and to YPF S.A. under a private power purchase agreement for 20 and 15 years respectively.

The agreement is subject to the fulfillment of certain condition precedents such as approval of the relevant antitrust authorities and obtaining project financing.

Source : Strategic Research Institute
voda
0
Equinor Joins Wind Farm Development in Argentina

Equinor and YPF Luz announced that the companies have entered an agreement where a subsidiary of Equinor will subscribe to shares in Luz del León. Luz del León is the company in charge of the Cañadón León wind farm project, currently under construction, located in the province of Santa Cruz in Argentina. The shareholders of YPF Luz are YPF S.A and an affiliate of General Electric. The agreement establishes that Equinor will have a 50% stake of Luz del León, with an equity contribution of USD 30 million. After the subscription and capital integration, YPF Luz and Equinor will jointly control Luz del León, while YPF Luz will be in charge of the operations of the Cañadón León Wind Farm project. After the completion of the works, the wind farm will have a capacity of about 120 MW of power and a total investment estimated to around USD 190 million.

The total installed capacity and power has already been sold to CAMMESA under the RENOVAR 2 Program and to YPF S.A. under a private power purchase agreement for 20 and 15 years respectively.

Mr Martin Mandarano, CEO of YPF Luz said that “We are very satisfied with this agreement with Equinor as a strategic partner for the development of the Cañadón León wind farm. In this way, we add to our projects another very important worldwide energy leader, thus reflecting the confidence of such players and global investors in YPF Luz.”

Executive vice president for New Energy Solutions in Equinor, Pål Eitrheim said that “We are pleased to deepen and strengthen our relationship with Argentina’s leading energy company YPF, now also within wind power. We are looking forward to contributing to the development of the Cañadón León wind farm project and work together with YPF Luz.”

The agreement is subject to the fulfilment of certain condition precedents such as approval of the relevant antitrust authorities and obtaining project financing.

Source : Strategic Research Institute
voda
0
AES Tiete Plans to Build 500 MW of Wind Farms in Bahia

Renewables Now reported that Brazilian power producer AES Tiete Energia SA is working to close energy supply contracts so it could proceed with building 500 MW of wind farms in Bahia state, the company's president, Italo Freitas, said during a conference call. According to the executive, the local unit of US energy company AES Corp has secured an option to acquire wind projects in advanced stage of development, totalling 500 MW.

The company has also been working to fulfil precedent conditions of its agreement with Renova Energia SA for the acquisition of the 743-MW Alto Sertao III wind complex, Freitas said while answering a question during the conference call.

AES Tiete Energia SA agreed to acquire the asset plus a 1.1-GW wind project pipeline in April, but national power watchdog Aneel blocked the planned sale of Alto Sertao's 305-MW Phase B. At the same time, there is the possibility that the project's existing energy supply contracts could be revoked.

Source : Strategic Research Institute
voda
0
Vineyard Wind Statement on Project Delay

Vineyard Wind released an update about ongoing discussions with the US Bureau of Ocean Energy Management on the project’s delayed issuance of a federal Environmental Impact Statement. It said that “The federal government’s decision to further delay the approval of the FEIS for the Vineyard Wind 1 project comes as a surprise and disappointment. To be clear, the Vineyard Wind 1 project remains viable and is committed to move forward. While we appreciate that the discussion on cumulative impacts is driven by rapid growth of the industry beyond our project, we urge the federal government to complete the review of Vineyard Wind 1 as quickly as possible. The project is poised to kickstart a new offshore wind industry that promises industrial growth along with new manufacturing and blue-collar employment across the United States from New England to Louisiana to Colorado and beyond.

Even though today’s decision will delay development of American offshore wind projects, Vineyard Wind remains deeply committed to the emerging industry’s success. We firmly believe that once regulators are fully satisfied, our project and dozens of others will deliver billions of dollars of new investment in ports, enhanced energy independence, and above all, high-paying, long-term jobs for thousands of Americans.”

Source : Strategic Research Institute
voda
0
Enel Green Power to Supply Renewable Energy to Gap Inc

Enel, through its US based renewable company Enel Green Power North America, has signed a 12 year virtual power purchase agreement with apparel retailer Gap Inc under which the latter will purchase the energy delivered to the grid by a 90 MW portion of Enel Green Power’s new Aurora1 wind project, currently in development in North Dakota. The wind energy supplied to Gap Inc. under the agreement is enough to power over 1,500 Gap Inc retail stores, equivalent to around 50% of the electricity needs of the more than 3,300 stores operated by Gap Inc worldwide.

The electricity output that Gap Inc is purchasing from Aurora’s 90 MW section is expected to total approximately 374 GWh each year, equivalent to avoiding the emission of 253,000 tonnes of CO2 per year.

The agreement with Enel Green Power North America will help Gap Inc. reach its 2020 goal to reduce its Scope 1 and Scope 2 greenhouse gas emissions by 50% compared to a 2015 baseline.

Mr Art Peck, president and chief executive officer, Gap Inc said that “We have a responsibility to reduce our climate impact. For Gap Inc, being a part of the climate solution means making strategic investments in clean energy generation. Today we have secured a path to achieving our 2020 goal, but we must do more. I’m proud to commit to renewable energy for 100 percent of our stores, headquarters and distribution centres globally by 2030.”

Source : Strategic Research Institute
voda
0
RES Announces Joint Development Venture for Texas Wind Project

Renewable Energy Systems announced that it has agreed to jointly develop an approximately 480 MW Maverick Creek Wind Project in Texas with Algonquin Power & Utilities Corp. Maverick Creek is located in Concho County, Texas, a particularly favorable wind area in central Texas. Capitalizing on Texas’ ambition for clean energy development, the project will provide an economic investment opportunity as well as an increase in clean energy jobs. It is financed through a virtual 15-year power purchase agreement with General Mills.

Construction of the project is expected to begin in September 2019 and will create nearly 175 jobs during peak construction. Once complete in late 2020, the approximately 480 MW project will generate renewable energy to power approximately 168,000 homes annually.

The project was originally developed by Roaring Fork Wind, LLC, a joint venture partnership between RES (Renewable Energy Systems) and Steelhead Americas, Vestas’ development arm in North America. CIBC Capital Markets acted as exclusive financial advisor to Roaring Fork, LLC as part of the transaction.

Source : Strategic Research Institute
740 Posts, Pagina: « 1 2 3 4 5 6 ... 18 19 20 21 22 23 24 25 26 27 28 ... 33 34 35 36 37 » | Laatste
Aantal posts per pagina:  20 50 100 | Omhoog ↑

Meedoen aan de discussie?

Word nu gratis lid of log in met uw e-mailadres en wachtwoord.

Direct naar Forum

Markt vandaag

AEX 913,85 +0,29 +0,03% 16:24
AMX 953,63 -0,13 -0,01% 16:24
ASCX 1.222,14 +3,52 +0,29% 16:09
BEL 20 3.997,02 +1,92 +0,05% 16:24
Germany40^ 18.706,30 -32,51 -0,17% 16:24
US30^ 39.918,70 +34,20 +0,09% 16:23
US500^ 5.300,14 +2,38 +0,04% 16:23
Nasd100^ 18.564,10 +1,20 +0,01% 16:23
Japan225^ 38.713,20 +159,30 +0,41% 16:23
WTI 78,88 +0,10 +0,13% 16:23
Brent 83,28 +0,02 +0,02% 16:23
EUR/USD 1,0860 -0,0007 -0,06% 16:24
BTC/USD 66.230,04 +743,19 +1,13% 16:23
Gold spot 2.401,68 +24,90 +1,05% 16:24
#/^ Index indications calculated real time, zie disclaimer
BESTEL HIER UW TICKETS VOOR DE IEX BELEGGERSDAG > EEN DAG VOL INSPIRERENDE SPREKERS EN KOOPTIPS!

Stijgers & Dalers

Stijgers Laatst +/- % tijd
ING 16,432 +0,206 +1,27% 16:07
Philips Koninklijke 25,730 +0,320 +1,26% 16:07
UMG 28,500 +0,340 +1,21% 16:07
Dalers Laatst +/- % tijd
PROSUS 35,570 -1,055 -2,88% 16:07
ADYEN NV 1.248,000 -34,200 -2,67% 16:07
IMCD 139,650 -3,000 -2,10% 16:07

EU stocks, real time, by Cboe Europe Ltd.; Other, Euronext & US stocks by NYSE & Cboe BZX Exchange, 15 min. delayed
#/^ Index indications calculated real time, zie disclaimer, streaming powered by: Infront